18 S&C Instruction Sheet 695-505
Installation
Cables
STEP 1.
Remove the cover panels by unscrewing the
pins connecting the panels to the front of the
enclosure. Lift the front of each panel upwards
and pull outwards to disengage the tab at the
back of the panel from the slot at the bottom of
the operating mechanism. See Figure 16.
STEP 2.
When pulling cables, the hinged roof can be
placed in a second, more vertical position. While
pushing up slightly on the hinged roof, release
the latches on the “hold-open” mechanisms on
both sides of the switchgear enclosure. Lift the
hinged roof to the second, more vertical
position; the “hold-open” latching mechanism
will automatically engage. See Figure 17 on
page 19. Lifting the hinged roof to the second,
more vertical position is a two-person exercise,
especially on switchgear assemblies having
four or more ways.
NOTICE
The hinged roof cannot be placed in
the second, more vertical position if the
hinged-roof counterweights are attached.
If necessary, remove the pins connecting
the upper and lower lever arms of the
counterweight mechanism. See Figure 18
on page 20.
WARNING
Before energizing the switchgear, replace
the shipping covers on all bushings and
bushing wells with elbows or insulated
protective covers or caps.
Failure to replace
the shipping covers on all bushings with
elbows or insulated protective covers
or caps can result in a flashover and
serious personal injury or death.
STEP 3.
Remove the shipping covers from the
600-ampere bushings (yellow) or 200-ampere
bushing wells (orange). See Figure 20 on
page 21.