Appendix A

Routine Switchgear Testing

For the convenience of users who normally perform 
electrical tests on system components such as switch-
gear, appropriate withstand test values for Vista SD 
Underground Distribution Switchgear are given in the 
following tables. These test values are significantly greater 
than the normal operating voltage of the switchgear and 
are near the flashover voltage of the switchgear. They 
should be applied only when the switchgear is completely 
de-energized and disconnected from all power sources.

 WARNING

When performing electrical withstand tests on Vista 
SD Underground Distribution Switchgear, always 
observe the following precautions. 

Failure to observe 

these precautions can result in a flashover, injury, 

and equipment damage.

1.  Completely de-energize the switchgear and 

disconnect it from all power sources.

2.  Terminate bushings with an insulated cap or other 

appropriate cable termination capable of withstanding 
the test voltage.

 The power-frequency withstand test voltages listed in the table are 

approximately 80% of the design values for new equipment.

 The dc withstand test voltages listed in the table are approximately 

80% of the design values for new equipment. 

 Dc withstand test voltages are given for reference for those users 

performing dc withstand tests. The presence of these values does not 
imply a dc withstand rating or performance requirements for the switch-
gear. A dc withstand design test is specified for new equipment because 
the switchgear may be subjected to dc test voltage when connected to 
the cable. The dc withstand test voltages listed in the table are approxi-
mately equal to the ac test voltage.

Dc Cable Testing and Fault Locating

Dc testing of installed cables is performed to determine 
the condition of the cables and to locate faults. Industry 
standards such as IEEE 400, “IEEE Guide for Making 
High-Direct-Voltage Tests on Power Cable Systems in the 
Field,” describe such testing and should be referenced for 
selection of the test procedures. Dc testing also includes 
cable “thumping” (the sudden application of dc voltage 
from a large capacitor for the purpose of fault locating), 
which causes transients and voltage doubling at the end of 
the open cable. When the cables are attached to the switch-
gear, the unit will also be subjected to the dc test voltages.

 WARNING

The dc withstand capability of the switchgear may be 
reduced because of aging, damage, or electrical or 
mechanical wear. Therefore, the dc test voltage must 
be selected so it does not exceed the withstand limits 
of the switchgear. 

Application of dc test voltage 

greater than the withstand capability of the 

switchgear can result in a flashover, injury, and 

equipment damage.

 WARNING

Do not exceed the test voltages given in Table 4 on page 
26. Exceeding the test voltages can cause a flashover 
of the isolating gap or phase-to-phase insulation of 
the switchgear. 

This can lead to a power-frequency 

fault in the gear of the dc test source, and result in 

severe personal injury of death.

Table 3. Maximum Insulation Test Voltages

Vista SD Switchgear Rating, kV

Withstand Test Voltage, kV

IEC

IEEE

Impulse (BIL)

Power Frequency

Dc

②③

12

17.5

95

31

42

24

29

125

45

62

Содержание Vista SD 101

Страница 1: ...Location of Safety Labels and Tags Single Way Vault Mounted Style 5 Multi Way Vault Mounted Style 6 Pad Mounted Style 7 Safety Precautions 8 Shipping and Handling Packing 9 Inspection 9 Handling 10 I...

Страница 2: ...hey are not intended to be a substitute for adequate training and experience in safety procedures for this type of equipment Read this Instruction Sheet NOTICE Thoroughly and carefully read this instr...

Страница 3: ...d user s claim All other warranties whether express or implied or arising by operation of law course of dealing usage of trade or otherwise are excluded The only warranties are those stated in Price S...

Страница 4: ...cautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If...

Страница 5: ...er Circuits and Components Live G 6700 C WARNING Do Not Block Pressure Relief Device not shown G 6742 D WARNING Voltage Tester Always Test for Proper Operation G 9451 Figure 1 Location of safety label...

Страница 6: ...d Components Live G 6700 C WARNING Do Not Block Pressure Relief Device not visible G 6742 D WARNING Voltage Tester Always Test for Proper Operation G 9451 Figure 2 Location of safety labels Model 312...

Страница 7: ...e G 6742 D WARNING Voltage Tester Always Test for Proper Operation G 9451 E WARNING Keep Out Hazardous Voltage Inside G 6398 Figure 3 Location of safety labels Model 422 4 way pad mounted style unit s...

Страница 8: ...attempting to open a door The use of undue force may damage the door latching mechanism 7 SAFETY LABELS Do not remove or obscure any of the DANGER WARNING CAUTION or NOTICE labels 8 ENERGIZED BUSHINGS...

Страница 9: ...ardboard Inspection Examine the shipment for external evidence of damage as soon after receipt as possible preferably before removal from the carrier s conveyance Check the bill of lading to make sure...

Страница 10: ...ble for two way and three way switchgear assemblies See Figure 4 and Figures 5 and 6 on page 11 STEP 2 Arrange the hoist slings to distribute lifting forces equally between the lifting tabs STEP 3 Avo...

Страница 11: ...on Sheet 695 505 11 Shipping and Handling Figure 6 Hoisting a pad mounted style Vista SD switchgear assembly multi way assembly shown Figure 5 Hoisting a multi way vault mounted style Vista SD switchg...

Страница 12: ...es mounted in the horizontal orientation catalog number suffix V3 the clearance between the back of the bus work and the floor of the vault is approximately inch 13 mm Be sure the floor beneath the sw...

Страница 13: ...switchgear assembly is suspended by the hoist slings remove the mounting stand feet STEP 6 Lower the switchgear assembly through the manhole opening STEP 7 Re install the mounting stand feet removed i...

Страница 14: ...lt in damage to the bushings and bushing wells STEP 2 Install cable support brackets in accordance with the appropriate reference drawing included in the installation and operation information kit See...

Страница 15: ...single or multiple connection to realize the maximum momentary rating of the switchgear assembly For a multiple cable connection cables smaller than 1 0 copper or equivalent should not be used STEP 4...

Страница 16: ...og dimensional drawing Make sure the hinged roof section and all doors open and the latch closes without binding Binding indicates enclosure distortion that must be corrected by additional shimming Ac...

Страница 17: ...ee Figure 14 Open door far enough to permit the door holder mechanism to engage automatically STEP 5 To open the left hand door lift the finger latch See Figure 15 Open door far enough to permit the d...

Страница 18: ...tical position is a two person exercise especially on switchgear assemblies having four or more ways NOTICE The hinged roof cannot be placed in the second more vertical position if the hinged roof cou...

Страница 19: ...into the pit horizontally and up to the gear at a 90 angle Failure to follow these precautions can result in damage to the bushings and bushing wells STEP 4 Install cable support brackets in accordanc...

Страница 20: ...re See Figure 18 Then cut the plastic cable ties holding the longer lever arms in the down position STEP 3 At one end of the enclosure pivot the longer lever arm up and position it on the back side of...

Страница 21: ...con tinuous ground bus catalog number suffix O connect the ground bus to the enclosure ground pad Then connect the enclosure ground pad to the system ground in accordance with the user s standard prac...

Страница 22: ...s instruc tions Optional mounting provisions for fault indicators catalog number suffix F1 or F2 are available for Vista SD Underground Distribution Switchgear If mounting provisions are specified mo...

Страница 23: ...ld open mechanism At the other end of the enclosure push up on the hinged roof just enough to allow the left hand hold open mechanism latch to be released ensuring the right hand hold open latching me...

Страница 24: ...es between the cable and the conduit and cap all empty conduits to prevent the entry of moisture and rodents STEP 2 Wipe down the exterior of the enclosure with a clean damp cloth Refinish any scratch...

Страница 25: ...t because the switchgear may be subjected to dc test voltage when connected to the cable The dc withstand test voltages listed in the table are approxi mately equal to the ac test voltage Dc Cable Tes...

Страница 26: ...made after installa tion of the power cable system including terminations and joints but before the cable system is placed in normal service A maintenance test is a field test made during the operati...

Страница 27: ...ging the cable and regrounding the cable Failure to follow these recommendations can result in a flashover injury and equipment damage NOTICE When VLF cable testing has been completed or has been inte...

Отзывы: