background image

S&C Instruction Sheet 695-505    27

Appendix A

 WARNING

The VLF ac withstand capacity of the switchgear may 
be reduced because of aging, damage, or electrical or 
mechanical wear. Therefore, the ac test voltage must 
be selected so it does not exceed the withstand limits 
of the switchgear. 

Application of ac test voltage 

greater than the withstand capability of the 

switchgear can result in a flashover, injury, and 

equipment damage.

 WARNING

Do not exceed the test voltages given in Table 5. 
Exceeding the test voltages can cause a flashover of 
the isolating gap or phase-to-phase insulation of the 
switchgear. 

This can lead to a power-frequency 

fault in the gear or the VLF test source, and result 

in severe personal injury or death.

 WARNING

When testing cables connected to energized 
switchgear, proper isolation of the power-frequency 
source from the VLF test source must be maintained. 
Follow the recommendations provided by the 
manufacturer of the VLF test equipment. Follow the 
user’s operating and safety procedures for grounding 
the cable, connecting the VLF test source, isolating the 
VLF test source (in case of flashover), ungrounding the 
cable, applying the VLF test source, discharging the 
cable, and regrounding the cable. 

Failure to follow 

these recommendations can result in a flashover, 

injury, and equipment damage.

NOTICE

When VLF cable testing has been completed, 

 

or has been interrupted, the cable system and the 
test equipment must be discharged. Allow the time 
needed to fully discharge the cable system and test 
equipment. 

Failure to fully discharge the cable 

system and test equipment can result in serious 

damage to the cable system and test equipment.

Fault-Interrupter Testing

When performing dielectrical tests on Vista SD Underground 
Distribution Switchgear, the vacuum fault interrupters will 
not be subject to voltage across the open gap because the 
disconnect switch isolates the vacuum interrupters from 
the test voltage. Since the vacuum interrupter will not be 
energized across the open gap, there is no exposure to the 
X-rays normally associated with high-voltage testing of 
vacuum devices. Routine testing of the vacuum fault inter-
rupters is not recommended. For those users who desire 
to test the vacuum interrupters, contact the nearest S&C 
Sales Office for specific instructions.

Table 5. Vista SD Switchgear Very Low Frequency (.01- to 1-Hz) Sinusoidal Waveform Maximum Test Voltages

Vista SD Switch-gear 

System Class, kV

Acceptance Test (phase to ground)

Maintenance Test (phase to ground)

kV, RMS

kV, Peak

kV, RMS

kV, Peak

15.5

23

33

19

26

27

36

51

27

38

Содержание Vista SD 101

Страница 1: ...Location of Safety Labels and Tags Single Way Vault Mounted Style 5 Multi Way Vault Mounted Style 6 Pad Mounted Style 7 Safety Precautions 8 Shipping and Handling Packing 9 Inspection 9 Handling 10 I...

Страница 2: ...hey are not intended to be a substitute for adequate training and experience in safety procedures for this type of equipment Read this Instruction Sheet NOTICE Thoroughly and carefully read this instr...

Страница 3: ...d user s claim All other warranties whether express or implied or arising by operation of law course of dealing usage of trade or otherwise are excluded The only warranties are those stated in Price S...

Страница 4: ...cautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If...

Страница 5: ...er Circuits and Components Live G 6700 C WARNING Do Not Block Pressure Relief Device not shown G 6742 D WARNING Voltage Tester Always Test for Proper Operation G 9451 Figure 1 Location of safety label...

Страница 6: ...d Components Live G 6700 C WARNING Do Not Block Pressure Relief Device not visible G 6742 D WARNING Voltage Tester Always Test for Proper Operation G 9451 Figure 2 Location of safety labels Model 312...

Страница 7: ...e G 6742 D WARNING Voltage Tester Always Test for Proper Operation G 9451 E WARNING Keep Out Hazardous Voltage Inside G 6398 Figure 3 Location of safety labels Model 422 4 way pad mounted style unit s...

Страница 8: ...attempting to open a door The use of undue force may damage the door latching mechanism 7 SAFETY LABELS Do not remove or obscure any of the DANGER WARNING CAUTION or NOTICE labels 8 ENERGIZED BUSHINGS...

Страница 9: ...ardboard Inspection Examine the shipment for external evidence of damage as soon after receipt as possible preferably before removal from the carrier s conveyance Check the bill of lading to make sure...

Страница 10: ...ble for two way and three way switchgear assemblies See Figure 4 and Figures 5 and 6 on page 11 STEP 2 Arrange the hoist slings to distribute lifting forces equally between the lifting tabs STEP 3 Avo...

Страница 11: ...on Sheet 695 505 11 Shipping and Handling Figure 6 Hoisting a pad mounted style Vista SD switchgear assembly multi way assembly shown Figure 5 Hoisting a multi way vault mounted style Vista SD switchg...

Страница 12: ...es mounted in the horizontal orientation catalog number suffix V3 the clearance between the back of the bus work and the floor of the vault is approximately inch 13 mm Be sure the floor beneath the sw...

Страница 13: ...switchgear assembly is suspended by the hoist slings remove the mounting stand feet STEP 6 Lower the switchgear assembly through the manhole opening STEP 7 Re install the mounting stand feet removed i...

Страница 14: ...lt in damage to the bushings and bushing wells STEP 2 Install cable support brackets in accordance with the appropriate reference drawing included in the installation and operation information kit See...

Страница 15: ...single or multiple connection to realize the maximum momentary rating of the switchgear assembly For a multiple cable connection cables smaller than 1 0 copper or equivalent should not be used STEP 4...

Страница 16: ...og dimensional drawing Make sure the hinged roof section and all doors open and the latch closes without binding Binding indicates enclosure distortion that must be corrected by additional shimming Ac...

Страница 17: ...ee Figure 14 Open door far enough to permit the door holder mechanism to engage automatically STEP 5 To open the left hand door lift the finger latch See Figure 15 Open door far enough to permit the d...

Страница 18: ...tical position is a two person exercise especially on switchgear assemblies having four or more ways NOTICE The hinged roof cannot be placed in the second more vertical position if the hinged roof cou...

Страница 19: ...into the pit horizontally and up to the gear at a 90 angle Failure to follow these precautions can result in damage to the bushings and bushing wells STEP 4 Install cable support brackets in accordanc...

Страница 20: ...re See Figure 18 Then cut the plastic cable ties holding the longer lever arms in the down position STEP 3 At one end of the enclosure pivot the longer lever arm up and position it on the back side of...

Страница 21: ...con tinuous ground bus catalog number suffix O connect the ground bus to the enclosure ground pad Then connect the enclosure ground pad to the system ground in accordance with the user s standard prac...

Страница 22: ...s instruc tions Optional mounting provisions for fault indicators catalog number suffix F1 or F2 are available for Vista SD Underground Distribution Switchgear If mounting provisions are specified mo...

Страница 23: ...ld open mechanism At the other end of the enclosure push up on the hinged roof just enough to allow the left hand hold open mechanism latch to be released ensuring the right hand hold open latching me...

Страница 24: ...es between the cable and the conduit and cap all empty conduits to prevent the entry of moisture and rodents STEP 2 Wipe down the exterior of the enclosure with a clean damp cloth Refinish any scratch...

Страница 25: ...t because the switchgear may be subjected to dc test voltage when connected to the cable The dc withstand test voltages listed in the table are approxi mately equal to the ac test voltage Dc Cable Tes...

Страница 26: ...made after installa tion of the power cable system including terminations and joints but before the cable system is placed in normal service A maintenance test is a field test made during the operati...

Страница 27: ...ging the cable and regrounding the cable Failure to follow these recommendations can result in a flashover injury and equipment damage NOTICE When VLF cable testing has been completed or has been inte...

Отзывы: