26    S&C Instruction Sheet 695-505

Appendix A

Vista SD Underground Distribution Switchgear has 

been designed to allow dc testing of the cables with the 
other ways of the gear energized. After testing, the dc test 
equipment should be used to discharge any stored charge 
on the cable. The dc test voltages and dc cable-thumping 
voltages should not exceed the voltages given in Table 4.

 WARNING

When testing cables connected to energized 
switchgear, proper isolation of the power- 
frequency source from the dc test source must be 
maintained. Follow the recommendations provided 
by the manufacturer of the dc test equipment or fault-
locating equipment. Follow the user’s operating and 
safety procedures for grounding the cable, connecting 
the dc test source, isolating the dc test source (in case 
of flashover), ungrounding the cable, applying the dc 
test source, discharging the cable, and regrounding 
the cable. 

Failure to follow these recommendations 

can result in a flashover, injury, and equipment 

damage.

Very Low Frequency (VLF) Cable Testing

IEEE Standard 400.2, “IEEE Guide for Field Testing of 
Shielded Power Cable Systems Using Very Low Frequency 
(VLF) (less than 1 Hz),” addresses the application of  
0.01- to 1-Hz high-voltage ac excitation as one means for 
evaluating a shielded power cable system during an accep-
tance test or a maintenance test. The cable system must 
be taken out of service for this testing.

An acceptance test is a field test made after installa-

tion of the power cable system, including terminations 
and joints, but before the cable system is placed in normal 
service. A maintenance test is a field test made during the 
operating life of a power cable system to detect deteriora-
tion and to check serviceability of the system.

VLF cable testing may subject the Vista SD Underground 

Distribution Switchgear to the ac test voltage when the 
cables are attached to the switchgear. S&C recommends 
the Vista SD switchgear be completely de-energized and 
disconnected from all power sources when performing 
VLF cable testing. However, Vista SD switchgear has been 
designed to allow VLF testing of the cables with the other 
ways of the gear energized, if necessary. 

Upon completion of the VLF cable testing, or an inter-

ruption in the testing, the test set must be turned off to 
discharge the cable circuit and test set. Then, the cable 
system must be grounded.

The VLF sinusoidal waveform test voltage applied to the 

Vista SD switchgear must not exceed the voltages listed 
in Table 5 on page 27.

Table 4. Maximum Cable Testing and Cable Thumping Dc Withstand Voltages

Vista SD Switchgear Rating, kV

Dc Cable Test Voltage, kV

Dc Cable Thumping 

Voltage, kV

IEC

IEEE

Impulse (BIL)

12

17.5

95

34

17

24

29

125

40

20

 The dc cable thumping voltage is 50% of the dc cable test volt-

age because voltage doubling will occur at the open end of the cable, 
which is assumed to be a unit of Vista SD Underground Distribution 
Switchgear. If the open end of the cable is grounded, the dc cable-
thumping voltage applied to the cable and switchgear can be increased 
to the dc cable test voltage.

Содержание Vista SD 101

Страница 1: ...Location of Safety Labels and Tags Single Way Vault Mounted Style 5 Multi Way Vault Mounted Style 6 Pad Mounted Style 7 Safety Precautions 8 Shipping and Handling Packing 9 Inspection 9 Handling 10 I...

Страница 2: ...hey are not intended to be a substitute for adequate training and experience in safety procedures for this type of equipment Read this Instruction Sheet NOTICE Thoroughly and carefully read this instr...

Страница 3: ...d user s claim All other warranties whether express or implied or arising by operation of law course of dealing usage of trade or otherwise are excluded The only warranties are those stated in Price S...

Страница 4: ...cautions are not followed NOTICE NOTICE identifies important procedures or requirements that can result in product or property damage if instructions are not followed Following Safety Instructions If...

Страница 5: ...er Circuits and Components Live G 6700 C WARNING Do Not Block Pressure Relief Device not shown G 6742 D WARNING Voltage Tester Always Test for Proper Operation G 9451 Figure 1 Location of safety label...

Страница 6: ...d Components Live G 6700 C WARNING Do Not Block Pressure Relief Device not visible G 6742 D WARNING Voltage Tester Always Test for Proper Operation G 9451 Figure 2 Location of safety labels Model 312...

Страница 7: ...e G 6742 D WARNING Voltage Tester Always Test for Proper Operation G 9451 E WARNING Keep Out Hazardous Voltage Inside G 6398 Figure 3 Location of safety labels Model 422 4 way pad mounted style unit s...

Страница 8: ...attempting to open a door The use of undue force may damage the door latching mechanism 7 SAFETY LABELS Do not remove or obscure any of the DANGER WARNING CAUTION or NOTICE labels 8 ENERGIZED BUSHINGS...

Страница 9: ...ardboard Inspection Examine the shipment for external evidence of damage as soon after receipt as possible preferably before removal from the carrier s conveyance Check the bill of lading to make sure...

Страница 10: ...ble for two way and three way switchgear assemblies See Figure 4 and Figures 5 and 6 on page 11 STEP 2 Arrange the hoist slings to distribute lifting forces equally between the lifting tabs STEP 3 Avo...

Страница 11: ...on Sheet 695 505 11 Shipping and Handling Figure 6 Hoisting a pad mounted style Vista SD switchgear assembly multi way assembly shown Figure 5 Hoisting a multi way vault mounted style Vista SD switchg...

Страница 12: ...es mounted in the horizontal orientation catalog number suffix V3 the clearance between the back of the bus work and the floor of the vault is approximately inch 13 mm Be sure the floor beneath the sw...

Страница 13: ...switchgear assembly is suspended by the hoist slings remove the mounting stand feet STEP 6 Lower the switchgear assembly through the manhole opening STEP 7 Re install the mounting stand feet removed i...

Страница 14: ...lt in damage to the bushings and bushing wells STEP 2 Install cable support brackets in accordance with the appropriate reference drawing included in the installation and operation information kit See...

Страница 15: ...single or multiple connection to realize the maximum momentary rating of the switchgear assembly For a multiple cable connection cables smaller than 1 0 copper or equivalent should not be used STEP 4...

Страница 16: ...og dimensional drawing Make sure the hinged roof section and all doors open and the latch closes without binding Binding indicates enclosure distortion that must be corrected by additional shimming Ac...

Страница 17: ...ee Figure 14 Open door far enough to permit the door holder mechanism to engage automatically STEP 5 To open the left hand door lift the finger latch See Figure 15 Open door far enough to permit the d...

Страница 18: ...tical position is a two person exercise especially on switchgear assemblies having four or more ways NOTICE The hinged roof cannot be placed in the second more vertical position if the hinged roof cou...

Страница 19: ...into the pit horizontally and up to the gear at a 90 angle Failure to follow these precautions can result in damage to the bushings and bushing wells STEP 4 Install cable support brackets in accordanc...

Страница 20: ...re See Figure 18 Then cut the plastic cable ties holding the longer lever arms in the down position STEP 3 At one end of the enclosure pivot the longer lever arm up and position it on the back side of...

Страница 21: ...con tinuous ground bus catalog number suffix O connect the ground bus to the enclosure ground pad Then connect the enclosure ground pad to the system ground in accordance with the user s standard prac...

Страница 22: ...s instruc tions Optional mounting provisions for fault indicators catalog number suffix F1 or F2 are available for Vista SD Underground Distribution Switchgear If mounting provisions are specified mo...

Страница 23: ...ld open mechanism At the other end of the enclosure push up on the hinged roof just enough to allow the left hand hold open mechanism latch to be released ensuring the right hand hold open latching me...

Страница 24: ...es between the cable and the conduit and cap all empty conduits to prevent the entry of moisture and rodents STEP 2 Wipe down the exterior of the enclosure with a clean damp cloth Refinish any scratch...

Страница 25: ...t because the switchgear may be subjected to dc test voltage when connected to the cable The dc withstand test voltages listed in the table are approxi mately equal to the ac test voltage Dc Cable Tes...

Страница 26: ...made after installa tion of the power cable system including terminations and joints but before the cable system is placed in normal service A maintenance test is a field test made during the operati...

Страница 27: ...ging the cable and regrounding the cable Failure to follow these recommendations can result in a flashover injury and equipment damage NOTICE When VLF cable testing has been completed or has been inte...

Отзывы: