Smart MBS RRH-P4 Installation Manual/Ver.2.0
© SAMSUNG Electronics Co., Ltd.
2-3
2.3 Unpacking and Transporting
This paragraph describes the work to unpack cabinets and other components and transport
them to the place to be installed. The cabinet is externally packed and cabinet and other
components are individually packed.
The external packing should be unpacked outside of the building. If necessary, it can
be unpacked after transporting to the area near installation place.
Transport the cabinet to the installation place. Be aware of the damage of walls, pillars,
and bottom of the passage when transporting the cabinet.
Transport other components with packing and sort by types.
2.3.1 Importing Items
To import items, be aware of the followings:
Regarding equipment weight and size, check the path to bring the equipment.
Lay Iron and veneer boards on stairs or doorsills to make the transportation easy.
When bring in equipment, beware of damage or impairment of main entrance, walls,
pillars, and floors of the station. Prepare protection materials and fix them with a high-
strength adhesive.
Carry boards in packing status, and unpack them when installing or mounting.
Vibration Level for Transportation
When carrying the system, fasten the system firmly not to exceed the proper vibration
level from 1 to 500 Hz.
When carrying system, use a lift to prevent accidents. However, if the system should
be carried by people, enough people are required to carry the system.
Before moving the system, check the storage place for the system and remove
obstacles in advance. While moving system, boards and other devices should not be
shocked physically and damaged caused by dust, moisture, and static electricity.
When installing the items imported, abide by the following:
System should be installed in a location whose access is not easy from outside.
2.3.2 Unpacking Items
The procedure to unpack items is as follows:
The packing items should be packed until they reach the installation place.
The items are classified in accordance with each job specification and stored on a
place with no interference on working.
Unpacked systems should be installed immediately. If not installed immediately, the
systems should be stored in the installation place temporarily.
Unpack the inner packaging after each system is placed on its installation location.
Unpack the inner packaging after each system is placed on its installation location.
Do not recycle the packaging waste. Dispose of them pursuant to the rules.
Содержание Smart MBS RRH-C2A
Страница 1: ...Ver 2 0 Smart MBS RRH C2A Installation Manual ...
Страница 18: ...TABLE OF CONTENTS XVI SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 32: ...CHAPTER 1 Before Installation 1 14 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 76: ......
Страница 79: ......