CHAPTER 2. Installation of RRH-C2A
2-24
© SAMSUNG Electronics Co., Ltd.
9) From the inside of the cabinet, pull the optic cable to the right side of the system and
attach temporarily with a cable tie.
10) Using a flat-head screwdriver (-, 1x100), turn the RRH power terminal’s screw counter-
clockwise twice to 3 times.
11) Insert the power cable to the terminal according to its use and polarity, then fasten the
screw.
12) Bind two cables (-48 V, RTN) at 100 mm from the terminal using a cable tie.
13) Bury the optic cable following the system’s inner-right wall up to the UADU#0 side
and bind using a cable tie.
14) Connect the connector of the optic cable to UADU’s designated port. (Loop the optic
cable’s excess length respecting the bending radius (R=110 mm), and arrange it at the
bottom of the DC power terminal. Be careful not to damage the optic cable during
other works.)
Figure 2.17 Peeling off the Hybrid Cable Sheath
Knife
1) Using a knife, peel off the heat shrink tube
that binds the cables together.
1
Heat Shrink Tube
Peeling Wire
Hybrid Cable Sheath
2) Pull the peeling wire to cut the hybrid cable’s
sheath.
2
3) Peel off the hybrid cable’s sheath.
Hybrid Cable Sheath
3
4
4) Peel off the aluminum foil wrapped around the
inner cable.
Содержание Smart MBS RRH-C2A
Страница 1: ...Ver 2 0 Smart MBS RRH C2A Installation Manual ...
Страница 18: ...TABLE OF CONTENTS XVI SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 32: ...CHAPTER 1 Before Installation 1 14 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Страница 76: ......
Страница 79: ......