3) Attach the junction box (breakout point) to the pole using a stainless steel band.
Tie the cables to the pole 500 mm below and 500 mm above the box.
(To stabilize the cables near the junction box’s cable input and output holes.)
Figure 2.37 Remaining length of Hybrid cable (2)
Pole
Junction Box
(Breakout Point)
Hybrid Cable
(from. DU Cabinet)
Power & Optic Cable
(to. RRH-C2A)
Cable Tie
Stainless steel Band
500 mm
Cable Tie
500 mm
Stainless steel Band