Checking Inspection Result (without SIM/PIM)
1
Click [EHP Power Consumption Inspection]
£
[Check
inspection result] when DMS2.5 web page menu screen
appears.
X
Channel setting by indoor unit must be done in advance.
2
Set date when inspection result screen appears.
X
Select year/month/day in order.
X
Based on DMS2.5 time, You can check up to 365 days of
inspection results.
3
Enter power consumption value during the period.
X
Virtual channel is value which is set in channel setting by
indoor unit.
4
Click [Calculate].
X
Power consumption by indoor unit during the period will
be displayed.
1
3
4
2
EHP Power Consumption Inspection (Continued)