5.5.7 Circulation pump for storage tank charging (CO2 F04)
This function can be selected for systems 2
and 3.
The circulation pump CP is switched off when
the storage charging pump SCP is activated
(factory setting). After switching off the stor-
age charging pump SCP, the circulation
pump CP operates according to the defined
time schedule. If you select CO2 F04-1, how-
ever, the circulation pump continues to oper-
ate in parallel with the storage charging
pump.
5.5.8 Parallel pump operation (CO2 F06)
Select this function for systems 2 and 3.
Should the total available capacity be suffi-
ciently high to operate both the heating sys-
tem and charge the drinking water storage
tank, you can configure the controller for par-
allel pump operation. Select CO2 F06 -1,
and for system 2 additionally select: 1 (paral-
lel pump operation). The heating circulation
pump then continues to operate during the
storage tank charging as long as the charg-
ing temperature does not exceed the current
set point for the heating circuit by more than
10 K and the max. permissible flow tempera-
ture is not exceeded. If the system deviation
of the charging temperature is higher than 5
K after the adjusted time Waiting time until
HCP off (default 600 sec), the heating circu-
lation pump is switched off for 10 minutes.
5.5.9 Thermal disinfection of drinking water storage tank (CO2 F05)
This function can be selected for systems 2
and 3, if one or two storage tank sensors are
configured. In conjunction with a storage
tank thermostat (CO2 F01-0), thermal disin-
fection cannot be used. On the configuration
level CO2, therefore, function block F01-1
must be set for one storage tank sensor, or
function blocks F01-1 and F02-1 must be set
for two storage tank sensors.
Activate thermal disinfection with CO2
F05-1. It protects the drinking water in the
storage tank from excessive contamination
with legionella. For this purpose, the drinking
water is strongly heated up. The day of the
week, the storage tank set point, the start
time and the stop time for this process can be
selected after you have activated the thermal
disinfection function (function block parame-
ter). Factory setting is for the thermal disin-
fection to start Wednesdays at 0:00 (mid-
night), with a storage tank set point of 70
°
C,
and to end at the very latest at 4:00 (a.m.),
even when the set point in the drinking water
storage tank has not been reached yet.
50
EB 5431 EN
Functional descriptions
Содержание TROVIS 5431
Страница 95: ...V Vacation for drinking water heating 51 66 Vacation periods 40 W Wall mounting 56 EB 5431 EN 95 Index...
Страница 96: ......
Страница 97: ...Code number EB 5431 EN 97 Code number 1732...
Страница 98: ......
Страница 101: ......