EB 9510 EN
5-1
Installation
5
Installation
The work described in this section is only to
be performed by personnel appropriately
qualified to carry out such tasks.
Risk of injury due to incorrect handling of
oxygen.
Î
Work on differential pressure meters
intended for the measurement of gaseous
oxygen must only be performed by
operating personnel who has undergone
training for work involving oxygen
service.
5.1
Installation conditions
Work position
The work position for the differential pressure
meter is the front view onto the operating
controls on the differential pressure meter
seen from the position of operating person-
nel.
Plant operators must ensure that, after instal-
lation of the differential pressure meter, the
operating personnel can perform all neces-
sary work safely and easily access the de-
vice from the work position.
Mounting orientation
Î
Keep rear blow-out opening clear.
Î
Mount the differential pressure meter in
the upright position only:
5.2
Preparation for installation
Proceed as follows:
Î
Flush the pipeline thoroughly before in-
stallation of the differential pressure me-
ter. Observe the maximum permissible
pressure for dp cell and plant.
Î
Check the differential pressure meter to
make sure that it is clean and not dam-
aged.
The plant operator is responsible for clean-
ing the pipelines in the plant.
DANGER
!
Note
Содержание Media 7 5007-1
Страница 6: ...6 EB 9510 EN...
Страница 14: ...1 8 EB 9510 EN...
Страница 20: ...2 6 EB 9510 EN...
Страница 41: ...EB 9510 EN 5 5 Installation Cover Option module Use a TORX T10 screwdriver Fig 5 2 Inserting option modules...
Страница 68: ...7 12 EB 9510 EN...
Страница 76: ...8 8 EB 9510 EN...
Страница 90: ...13 2 EB 9510 EN...
Страница 92: ...14 2 EB 9510 EN...
Страница 97: ...EB 9510 EN 15 5...
Страница 98: ...15 6 EB 9510 EN...
Страница 99: ...EB 9510 EN 15 7...
Страница 100: ...15 8 EB 9510 EN...
Страница 101: ...EB 9510 EN 15 9...
Страница 102: ...15 10 EB 9510 EN...
Страница 123: ......