11-2
EB 9510 EN
Decommissioning
Risk of burn injuries due to hot or cold com-
ponents and pipelines.
Î
Prior to performing any work on the
differential pressure meter, allow
components and pipelines to cool down
or warm up to the ambient temperature.
Î
Wear protective clothing and safety
gloves.
To decommission the differential pressure
meter before removing it, proceed as fol-
lows:
1. Isolate measuring lines.
Î
When a valve block is used:
2. Close the shut-off valves.
3.
Open the equalizing valve.
4. Slowly open the screw of the test con-
nection to release the pressure.
5. Disconnect the power supply.
6. Open the housing cover of the differen-
tial pressure meter and disconnect the
wires for the power supply.
WARNING
!
Содержание Media 7 5007-1
Страница 6: ...6 EB 9510 EN...
Страница 14: ...1 8 EB 9510 EN...
Страница 20: ...2 6 EB 9510 EN...
Страница 41: ...EB 9510 EN 5 5 Installation Cover Option module Use a TORX T10 screwdriver Fig 5 2 Inserting option modules...
Страница 68: ...7 12 EB 9510 EN...
Страница 76: ...8 8 EB 9510 EN...
Страница 90: ...13 2 EB 9510 EN...
Страница 92: ...14 2 EB 9510 EN...
Страница 97: ...EB 9510 EN 15 5...
Страница 98: ...15 6 EB 9510 EN...
Страница 99: ...EB 9510 EN 15 7...
Страница 100: ...15 8 EB 9510 EN...
Страница 101: ...EB 9510 EN 15 9...
Страница 102: ...15 10 EB 9510 EN...
Страница 123: ......