![Samoa LARIUS GHIBLI MIX 2K Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/samoa/larius-ghibli-mix-2k/larius-ghibli-mix-2k_operating-and-maintenance-manual_3745205019.webp)
MAN / AUT
K2
Before painting, spray the product into a container (
K4
) or into
a part of the cab (
K5
) dedicated to purging, while keeping the
spray-gun at a constant distance from the surface (500-700mm).
Use this same distance for all other applications.
This procedure will allow the user to perform any necessary adjust-
ments, such as: widening the spray, atomising-air adjustment,
adjustment of the various working pressures, etc.
K4
500-700 mm
K5
K3
K3
www.larius.com
19
ED. 04 - 04/2021 - Cod. 150183
LARIUS GHIBLI MIX 2K
Once this purging phase has been completed, the operator can
proceed with normal working operations.
After loading the two feed pumps and checking that the products
come out of their relevant recirculation,
make sure that the com-
ponents are flowing, in their relative lines, up to the mixing block.
If the equipment is being used for the first time, wash it to make
sure that there are no oil residues in the machine during the testing
phase (see the page related to “
washing new equipment
”).
Check for any machine alarms. If present, consult the “alarms”
page where the various modes of resolving alarm states are listed.
If the machine does not have any alarms active, proceed with the
setting of the machine’s parameters
(see the relative chapter)
.
Turn the selector (
K2
)to the AUTOMATIC position.
Wait for the flexible spray-gun tube to load
(wait for the valves
(
K3
) to shut off automatically)
.
The panel displays the message “loading paint needed”.
Make sure that the supply pumps provide the two
components either with B>A with the same delivery
pressure, or with pump B + 0.5/1 bar with respect
to the pump A supply.
Содержание LARIUS GHIBLI MIX 2K
Страница 4: ...I n t e n t i o n a l l y b l a n k p a g e...
Страница 36: ...I n t e n t i o n a l l y b l a n k p a g e...