“
A
SSEMBLY
I
NSTRUCTIONS
”
S
TEP
7
–
Stationary Handrail (68) Related Bolts, Washers and Nuts Attach Process
Follow
Step a.
,
b.
and
c.
to slightly attach all
related bolts, washers and nuts first.
Step a.
Slightly attach 2pcs
Bolts, Socket Head
(M8×p1.25×15mm)(136)
, 2pcs
Lock Washers
(M8)(110)
, 2pcs
Washers (8×16×2.0t)(111)
.
NOTE: Do not tighten at this moment.
Step b.
a. For inner side, slightly attach 1pcs
Bolt,
Socket Head (M8xp1.25x55mm)(150)
&
1pcs
Stopper (37)
, make sure that bolt head
faces the front like the drawing shown. And
slightly tighten with 1pcs
Nylon Nut
(M8xp1.25)(123)
. NOTE: Do not tighten at
this moment.
b. For the outer side, slightly attach 1pcs
Bolt,
Socket Head (M8×p1.25×50mm)(137)
,
make sure that bolt head faces the front like
the drawing shown. And slightly tighten with
1pcs
Nylon Nut (M8xp1.25)(123)
. NOTE:
Do not tighten at this moment.
Step c.
Slightly attach 1pcs
Bolt, Socket Head
(M10×p1.5×20mm)(141)
, 2pcs
Nylon Nuts
(M10×p1.5)(125)
. NOTE: Do not tighten at this
moment.
S
TEP
8
–
Right
Stationary Handrail (68) Tighten Process
Follow
Step a.
,
b.
and
c.
to use the right tool to fully
tighten smoothly.
Step c.
Step b.
Step a.
Step a.
Make sure that
Stopper and
Bolt Head face
to the front
Содержание TOTAL MOTION
Страница 44: ...PRODUCT PARTS DRAWING A...
Страница 45: ...PRODUCT PARTS DRAWING B...
Страница 46: ...PRODUCT PARTS DRAWING C...
Страница 47: ......