“
A
SSEMBLY
I
NSTRUCTIONS
”
Place all parts from the box in a cleared area and position them on the floor in front of you. Remove all packing materials
from your area and place them back into the box. Do not dispose of the packing materials until assembly is completed.
Read each step carefully before beginning.
S
TEP
1
–
Leveler (44) & Main Frame Assembly
a. Follow left drawing to attach
2pcs
Levelers (44)
under the
Main
Frame’s
Front Stabilizer
(transportation
wheels on the front). NOTE: This step could
require two people.
b. Be sure to tighten the
Levelers (44)
securely until screw lines are eliminated as
the
drawing 1
shown on the top right
corner.
NOTE:
If not level, review the
LEVELING NOTE
to level correctly.
S
TEP
2
–
Leveler (44) & Base Frame (91) Assembly
Follow left drawing to attach 2pcs
Levelers (44)
under the
Base Frame (91)
. Be sure to follow
the above process to level the
Levelers (44)
.
S
TEP
3
–
Base Frame (91)
Assembly
Place any stationary object under the
Main Frame (28)
and follow left drawing to attach the
Base Frame (91)
to
the
Main Frame (28)
and
fully tighten
4pcs
Bolts,
Socket Head (M10xp1.5x65mm)(138)
.
NOTE: This step
could require two people.
LEVELING NOTE
: After placing
the item in the intended
location, check the stability of
the item. If the equipment is not
level, reviewing the following
direction:
Loosen the
Leveler (44)
to
make the
Adjustment Plate
become less tight.
Use one hand to adjust the
Leveler (44)
for leveling.
Once the item is level, use the
other hand to tighten the
Adjustment Plate
securely
against the Stabilizer to lock the
Leveler (44)
in stable position
th b
d
i 2 h
Detailed Lever- drawing 1
Detailed Lever- drawing 2
Stabilizer
Adjustment
Plate
Leveler (44)
Adjustment
Plate
Stabilizer
Leveler (44)
Screw line
Содержание TOTAL MOTION
Страница 44: ...PRODUCT PARTS DRAWING A...
Страница 45: ...PRODUCT PARTS DRAWING B...
Страница 46: ...PRODUCT PARTS DRAWING C...
Страница 47: ......