3.
Connection of CT current transformers in the three-phase
device.
The voltage is read directly, while the current is measured via
the external current transformers.
The current transformers are already wired. They must be
installed on the cables of phases L1, L2 and L3, just after the
IGA, making the arrow match the direction that the current
follows in the installation when energy is fed into the network:
from the loads to the connection.
IMPORTANT
: respect the
order of phases L1, L2, L3
Pin
CT pin
Cable code
5
S1
L1 cable
6
S2
7
S1
L2 cable
8
S2
9
S1
L3 cable
10
S2
CONSUMPTION
GRID
P2
P1
Fig. 9. Wiring diagram of CT current transformers.
Power cables not supplied: 0.3 m mains cable (L1, L2,
L3, N), 1.5 mm
2
cross section.
SLC ENERGY MANAGER
ENERGY METER
USER MANUAL
Содержание Equinox SLC EM Lite
Страница 1: ...SLC EM Lite SLC EM SLC EM T ES EN FR MANUAL DE USUARIO ENERGY MANAGER...
Страница 38: ...38 SALICRU...
Страница 39: ...39 ES SLC ENERGY MANAGER ENERGY METER USER S MANUAL...
Страница 40: ...40 SALICRU Tambi n es posible acceder a la informaci n de los inversores instalados...
Страница 49: ...49 ES SLC ENERGY MANAGER ENERGY METER USER S MANUAL...
Страница 51: ...SLC EM Lite SLC EM SLC EM T EN USER MANUAL ENERGY MANAGER...
Страница 88: ...88 SALICRU...
Страница 89: ...89 EN SLC ENERGY MANAGER ENERGY METER USER MANUAL...
Страница 90: ...90 SALICRU It is also possible to access information on installed inverters...
Страница 99: ...99 EN SLC ENERGY MANAGER ENERGY METER USER MANUAL...
Страница 101: ...SLC EM Lite SLC EM SLC EM T FR MODE D EMPLOI ENERGY MANAGER...
Страница 138: ...138 SALICRU...
Страница 139: ...139 FR SLC ENERGY MANAGER ENERGY METER MANUEL D UTILISATEUR...
Страница 140: ...140 SALICRU Il est galement possible d acc der aux informations relatives aux onduleurs install s...
Страница 149: ...149 FR SLC ENERGY MANAGER ENERGY METER MANUEL D UTILISATEUR...