background image

94

SALICRU

12. INSTRUCTIONS FOR USE.

As the EM is still under development, the above description 

is subject to change without notice.

Once the SLC ENERGY MANAGER (hereinafter, EM) is correctly 

connected to the inverter's RS485 bus, it will monitor the main 

parameters, measurements, statuses and alarms of the inverter(s). 

Up to 10 inverters can be connected to the RS485 bus, each with 

a different address in the range of 1 to 10. The EM will function as 

the Master of the system, requesting data from each of them and, 

from time to time, scanning the bus for newly connected inverters. 

This process can also be enabled via the user interface. The EM 

can also send commands to the different inverters to change some 

of their parameters, adjust the amount of power generated and 

injected into the user's grid or even stop them.
The EM also has two built-in relays that can be programmed to 

make the most of the power generated by the inverters by starting/

stopping loads in the user's system. 
There are several ways to configure these relays via the user 

interface:

 

Manual On/Off. 

 

On/Off depending on the excess energy in the system. 

On/Off date/time programming.

Содержание Equinox SLC EM Lite

Страница 1: ...SLC EM Lite SLC EM SLC EM T ES EN FR MANUAL DE USUARIO ENERGY MANAGER...

Страница 2: ...en paralelo 6 2 5 Diagrama de conexionado general SLC EM trif sico con Inyecci n Cero con N inversores en paralelo 6 3 ALIMENTACI N DE LOS DISPOSITIVOS 6 3 1 Alimentaci n del SLC ENERGY MANAGER 6 4 CO...

Страница 3: ...CONDICIONES DE LA GARANT A 13 2 1 T rminos de la garant a 13 2 2 Exclusiones 13 3 RED DE SERVICIOS T CNICOS 14 ESPECIFICACIONES T CNICAS 15 ANEXO I INDICACIONES LED Y OPERACI N DEL DISPOSITIVO SLC ENE...

Страница 4: ...hacemos responsables de los errores u omisiones que pudieran existir Las im genes incluidas en este documento son a modo ilus trativo y pueden no representar exactamente las partes del equipo mostrada...

Страница 5: ...rica y consumo de la instalaci n 2 2 UTILIZANDO ESTE MANUAL La documentaci n de cualquier equipo est ndar est disponible en nuestra web para su descarga www salicru com Para los dispositivos alimentad...

Страница 6: ...s y cosas No respetar estas indicaciones puede causar da os en el propio equipo instalaci n o cargas Notas de informaci n Aspectos adicionales que com plementan los procedimientos b sicos Estas instru...

Страница 7: ...ratos el ctricos y electr nicos RoHS Seg n las especificaciones de las normas armonizadas Normas de referencia UNE EN IEC 61010 1 2011 A1 2020 Requisitos de segu ridad para equipos el ctricos de medid...

Страница 8: ...siguiente material no incluido m de cable de comunicaciones apantallado de un par trenzado y de 0 25 mm2 de secci n m de cable de red L N de la misma secci n que tiene la instalaci n Secci n m xima 1...

Страница 9: ...izaci n y control de energ a destinado a gestionar la energ a de la instala ci n Existen tres modelos SLC EM Lite SLC ENERGY MANAGER Lite SLC EM SLC ENERGY MANAGER SLC EM T SLC ENERGY MANAGER T 5 2 VI...

Страница 10: ...inales del equipo 5 3 3 Terminales del dispositivo SLC EM T Terminales del equipo Pin Marca Funci n Medidas de corriente L1 Iin R L1 Iin R L2 Iin S L2 Iin S L3 Iin T L3 Iin T Medidas de tensi n N Neut...

Страница 11: ...carril DIN de la caja de protecciones de la instalaci n en el espacio de separaci n que se ha habilitado Conelsentidodesdelaacometidahastalainstalaci n primero colocar el dispositivo SLC ENERGY MANAGE...

Страница 12: ...rica monof sico ICP IGA ID PIAs SLC ENERGY MANAGER CT Fig 6 Conexionado el ctrico del modelo monof sico sin inversor 6 2 2 Instalaci n el ctrica trif sico SLC ENERGY MANAGER ICP IGA IGA ID PIAs CT s F...

Страница 13: ...breviaturas ICP Interruptor de control de potencia IGA Interruptor general autom tico ID Interruptor diferencial MCB Interruptor magnetot rmico Magnetic Circuit Breaker Fus Fusibles SPD Protector de s...

Страница 14: ...P Interruptor de control de potencia IGA Interruptor general autom tico ID Interruptor diferencial MCB Interruptor magnetot rmico Magnetic Circuit Breaker CNT Contactor Fus Fusibles SPD Protector de s...

Страница 15: ...de control de potencia IGA Interruptor general autom tico ID Interruptor diferencial MCB Interruptor magnetot rmico Magnetic Circuit Breaker Fus Fusibles SPD Protector de sobretensiones Surge Protecti...

Страница 16: ...ICP Interruptor de control de potencia IGA Interruptor general autom tico ID Interruptor diferencial MCB Interruptor magnetot rmico Magnetic Circuit Breaker CNT Contactor Fus Fusibles SPD Protector de...

Страница 17: ...MCB MCB Fus Fus SPD SPD Inverter 2 Inverter 1 ID ID IGA ID PIAs CT s Leyenda abreviaturas ICP Interruptor de control de potencia IGA Interruptor general autom tico ID Interruptor diferencial MCB Inte...

Страница 18: ...nes Surge Protection Device PIA Peque o interruptor autom tico PV Paneles fotovoltaicos SLC ENERGY MANAGER Dispo sitivo de monitorizaci n y control de energ a Para no sobrecargar el es quema los cable...

Страница 19: ...por el inversor solar EQUINOX2 para poder visualizarlos en la aplicaci n EQX sun 1 Alimentar el dispositivo SLC ENERGY MANAGER Este elemento es el primero que se tiene que instalar despu s del IGA Co...

Страница 20: ...Se deben instalar en los cables de la fase L1 justo despu s del IGA haciendocoindicirlaflechaconelsentidoquesiguelacorriente en la instalaci n cuando se vierte energ a a la red desde las cargas hacia...

Страница 21: ...L2 y L3 justo despu sdelIGA haciendocoindicirlaflechaconelsentidoque siguelacorrienteenlainstalaci ncuandosevierteenerg aala red desde las cargas hacia la acometida IMPORTANTE respetar el orden de las...

Страница 22: ...2 de secci n para las comunicaciones entre el inversor conectores tabla 1 y el dispositivo SLC Energy Manager Potencia Inversor Manguera 1 4 25 kW 1 2 3 Pin Cable 1 RS485 2 RS485 3 GND 3 pines 33 50 k...

Страница 23: ...ncias 4 25 kW Antes de conectar los cables pasarlos por el prensa estopas Puerto 2 Inversor EQX2 T 4 25 kW 1 2 3 al Inversor Potencias 33 60 kW Antes de conectar los cables pasarlos por el prensa esto...

Страница 24: ...nes del equipo debe desconectarse de cualquier fuente de alimenta ci n sea de la propia alimentaci n como de medida El equipo debe instalarse aguas abajo de la protecci n ge neral de la instalaci n In...

Страница 25: ...SW3 SW4 SW5 CT 0 0 0 0 1 80 A 100 mA 0 0 0 1 0 200 A 100 mA 0 0 0 1 1 300 A 100 mA 0 0 1 0 0 400 A 100 mA 0 0 1 0 1 600 A 100 mA 0 0 1 1 0 1000 A 100 mA 0 0 1 1 1 2000 A 100 mA Tabla 5 Posici n de lo...

Страница 26: ...NAGER a Desde el men principal pulsar ENT X veces seg n el n mero de MPPTs del equipo hasta llegar al men Config general b Pulsardurante3s paraentraralsiguientemen InfoSist c Pulsar ENT 13 veces hasta...

Страница 27: ...r la funci n seguir los siguientes pasos en el display del inversor Configuraci n general L mite de potencia asegurar que est configurado en la opci n OFF Configuraci n general Exportaci n configurar...

Страница 28: ...par metros En el campo Address introducir una direcci n IP entre la 192 168 1 50 y 192 168 1 100 siendo los tres primeros valores fijos y el ltimo modificable de 51 a 100 Finalmente despu s de guardar...

Страница 29: ...ro 8 3 PANEL EMBARCADO Este servicio permite monitorizar el estado del equipo de forma remota y en tiempo real Permite la configuraci n de red del dispositivo y una gesti n remota de algunas funcional...

Страница 30: ...rvidores NTP El usuario de instalador incorpora una nueva pantalla para la gesti n de los par metros necesarios del Energy Manager en el momento de realizar la instalaci n 8 3 2 Informaci n La p gina...

Страница 31: ...P 1 3 2 No es necesario a adir las DNS para una correcta configuraci n de la red WiFi No es compatible con redes WiFi de 5GHz nicamente se podr establecer conexi n WiFi con redes dentro del rango de f...

Страница 32: ...como por ejemplo la Inyecci n Cero Par metro Estado Descripci n Inicializaci n Correcta del Medidor Correcte Meter Initialitzation El Medidor se ha inicializado correctamente X El Medidor NO se ha ini...

Страница 33: ...ue la aplicaci n permita introducir los campos necesarios para crear una Cuenta tramitar el alta y poder utilizar la aplicaci n Despu s de introducir los campos indicados hacer clic en Siguiente Tambi...

Страница 34: ...con el remitente postmaster kumo salicru com y asunto Equinox Reset password 5 En el contenido del mensaje se encuentra un c digo Token de 6 d gitos Introducir el c digo entrar y confirmar la nueva co...

Страница 35: ...eando Para crear una planta pulsar el bot n a adir a la derecha de Mis plantas Fig 11 Creaci n de planta Aparecer el panel de A adir planta Rellenar todos los campos obligatorios Nombre de la Planta T...

Страница 36: ...hacer clic en A adir planta Finalmente aparecer una pantalla donde se indica que la Planta se ha creado con xito y ofrece una visi n detalla de la Planta que se acaba de crear Entre las opciones dispo...

Страница 37: ...r de pantalla Mediante se accede al Sin ptico en tiempo real de la planta seleccionada donde es posible navegar por distintas pantallas Sin ptico Curva de potencia diaria Balance energ tico del d a po...

Страница 38: ...38 SALICRU...

Страница 39: ...39 ES SLC ENERGY MANAGER ENERGY METER USER S MANUAL...

Страница 40: ...40 SALICRU Tambi n es posible acceder a la informaci n de los inversores instalados...

Страница 41: ...41 ES Finalmente encontramos varias pantallas de DEMO y una de informaci n de la aplicaci n SLC ENERGY MANAGER ENERGY METER USER S MANUAL...

Страница 42: ...ma del apartado 6 2 INSTALACI N EL CTRICA 11 1 1 Configuraci n de la instalaci n en la APP Pulsar encima de la planta que se ha creado para acceder a sus detalles A adir un dispositivo a la planta que...

Страница 43: ...l n mero de serie del equipo o escanear el c digo QR del dispositivo b Escoger el tipo de conexi n Ethernet o WiFi c Hacer clic en Siguiente 2 Conexi n del dispositivo via WiFi 3 Conexi n del disposit...

Страница 44: ...vezencuando escaneandoelbusenbuscadeinversores reci n conectados Este proceso tambi n se puede activar a trav s de la interfaz de usuario El EM tambi n puede enviar comandos a los diferentes inversore...

Страница 45: ...a la intervenci n del S S T en caso de aver a 13 2 2 Exclusiones SALICRU no quedar obligada por la garant a si advierte que el defecto en el producto no existe o fue causado por uso indebido negligenc...

Страница 46: ...de usuario Web embebida INVERSOR Capa f sica RS 485 Puertos RS 485 Sensor de tensi n Sensor de TC LAN WiFi Protocolo Modbus Velocidad 9600 Bits de datos 8 Bit de stop 1 Paridad No REL S Cantidad 2 Te...

Страница 47: ...or solar EQUINOX2 Comunicaci n con el inversor solar EQUINOX2 no establecida Asegurarse que la direcci n Modbus se ha introducido correctamente en el inversor solar y dentro del rango especificado V a...

Страница 48: ...ello buscar Internet Explorer en el buscador del sistema Haga clic derecho y seleccione la opci n Ejecutar como administrador Acceder al panel de forma normal Se mostrar una ventana de error Hacer cl...

Страница 49: ...49 ES SLC ENERGY MANAGER ENERGY METER USER S MANUAL...

Страница 50: ...alautordera BARCELONA Tel 34 93 848 24 00 sst salicru com SALICRU COM www linkedin com company salicru salicru_SA Gama de Productos Sistemas de Alimentaci n Ininterrumpida SAI UPS Estabilizadores Redu...

Страница 51: ...SLC EM Lite SLC EM SLC EM T EN USER MANUAL ENERGY MANAGER...

Страница 52: ...ters in parallel 6 2 5 General wiring diagram for three phase SLC EM with Zero Injection with N inverters in parallel 6 3 POWER SUPPLY FOR THE DEVICES 6 3 1 SLC ENERGY MANAGER power supply 6 4 COMMUNI...

Страница 53: ...ANCE 13 2 WARRANTY CONDITIONS 13 2 1 Warranty terms 13 2 2 Exclusions 13 3 TECHNICAL SERVICES NETWORK 14 TECHNICAL SPECIFICATIONS 15 ANNEX I LED INDICATIONS AND OPERATION OF THE SLC ENERGY MANAGER DEV...

Страница 54: ...rrors or omissions that may be present The images included in this document are for illustrative pur poses only and may not accurately represent the parts of the unit shown in this manual therefore th...

Страница 55: ...on and consumption data of the installation 2 2 USING THIS MANUAL The documentation for any standard unit is available for download on our website www salicru com For plug powered devices this is the...

Страница 56: ...nd things Failure to observe these instructions may result in damage to the unit installation or loads Information notes Additional aspects that comple ment the basic procedures These instructions are...

Страница 57: ...ifications of harmonised standards Reference standards UNE EN IEC 61010 1 2011 A1 2020 Safety requirements for electrical equipment for measurement control and laboratory use Part 1 General requiremen...

Страница 58: ...ials are necessary but are not included m shielded twisted pair communication cable with a 0 25 mm2 cross section m network cable L N with the same cross section as the installation Maximum cross sect...

Страница 59: ...ring and control device designed to manage the energy of the installation There are three models SLC EM Lite SLC ENERGY MANAGER Lite SLC EM SLC ENERGY MANAGER SLC EM T SLC ENERGY MANAGER T 5 2 VIEWS O...

Страница 60: ...nit terminals 5 3 3 SLC EM T device terminals Unit terminals Pin Marking Function Current measurements L1 Iin R L1 Iin R L2 Iin S L2 Iin S L3 Iin T L3 Iin T Voltage measurements N Neutral L1 Phase 1 L...

Страница 61: ...R device on the DIN rail of the installation s protection box in the separation space that has been enabled In the direction from the connection to the installation first place the SLC ENERGY MANAGER...

Страница 62: ...allation ICP IGA ID PIAs SLC ENERGY MANAGER CT Fig 6 Electrical connection of the single phase model without inverter 6 2 2 Three phase electrical installation SLC ENERGY MANAGER ICP IGA IGA ID PIAs C...

Страница 63: ...Fus SPD Inverter ID IGA ID PIAs CTs Legend abbreviations ICP Power control switch IGA Main circuit breaker ID Differential switch MCB Magnetic Circuit Breaker Fus Fuses SPD Surge Protection Device PI...

Страница 64: ...rter ID IGA ID PIAs CTs Legend abbreviations ICP Power control switch IGA Main circuit breaker ID Differential switch MCB Magnetic Circuit Breaker CNT Contactor Fus Fuses SPD Surge Protection Device P...

Страница 65: ...D IGA ID PIAs CTs Legend abbreviations ICP Power control switch IGA Main circuit breaker ID Differential switch MCB Magnetic Circuit Breaker Fus Fuses SPD Surge Protection Device PIA Small circuit bre...

Страница 66: ...nverter ID IGA ID PIAs CNT CTs Legend abbreviations ICP Power control switch IGA Main circuit breaker ID Differential switch MCB Magnetic Circuit Breaker CNT Contactor Fus Fuses SPD Surge Protection D...

Страница 67: ...ting installation Material optional 100 mA 2 ICP MCB MCB Fus Fus SPD SPD Inverter 2 Inverter 1 ID ID IGA ID PIAs CTs Legend abbreviations ICP Power control switch IGA Main circuit breaker ID Different...

Страница 68: ...Fuses SPD Surge Protection Device PIA Small circuit breaker PV Photovoltaic panels SLC ENERGY MANAGER Energy monitoring and control device In order not to overload the dia gram the earth cables have...

Страница 69: ...provided by the EQUINOX2 solar inverter for display in the EQX sun application 1 Power the SLC ENERGY MANAGER device This element is the first to be installed after the IGA Connect as indicated in the...

Страница 70: ...nstalled on the cables of phase L1 just after the IGA making the arrow match the direction that the current follows in the installation when energy is fed into the network from the loads to the connec...

Страница 71: ...er the IGA making the arrow match the direction that the current follows in the installation when energy is fed into the network from the loads to the connection IMPORTANT respect the order of phases...

Страница 72: ...ction for communications between the inverter table 1 con nectors and the SLC Energy Manager device Power Inverter Hose 1 4 25 kW 1 2 3 Pin Cable 1 RS485 2 RS485 3 GND 3 pins 33 50 kW Pin Cable 1 RS48...

Страница 73: ...fore connecting the cables pass them through the cable gland Port 2 EQX2 T Inverter 4 25 kW 1 2 3 To the Investor Powers 33 60 kW Before connecting the cables pass them through the cable gland EQX2 T...

Страница 74: ...s it must be disconnected from all power supplies whether from the power supply itself or a measurement source The unit must be installed downstream of the installation s general protection Install th...

Страница 75: ...0 0 1 0 200 A 100 mA 0 0 0 1 1 300 A 100 mA 0 0 1 0 0 400 A 100 mA 0 0 1 0 1 600 A 100 mA 0 0 1 1 0 1000 A 100 mA 0 0 1 1 1 2000 A 100 mA Table 5 Position of the microswitches according to the CT tra...

Страница 76: ...PTs in the unit until you reach the General Settings menu b Press for 3 seconds to enter the next Syst Info menu c Press ENT 13 times until you reach the Modbus Add menu pressfor3secondstoenterandacce...

Страница 77: ...n is adapted to the consumption To activate the function follow these steps on the inverter display General configuration Power limit make sure that it is set to OFF General configuration Export set t...

Страница 78: ...eters In the Address field enter an IP address between 192 168 1 50 and 192 168 1 100 with the first three values being fixed and the last one modifiable from 51 to 100 Finally after saving the config...

Страница 79: ...you are not sure 8 3 ON BOARD PANEL This service allows you to monitor the status of the unit remotely and in real time It allows network configuration of the device and remote management of some func...

Страница 80: ...onfiguring a proxy server NTP Screen for modifying the NTP servers The installer user incorporates a new screen for man aging the necessary Energy Manager parameters at the time of installation 8 3 2...

Страница 81: ...s not necessary to add the DNS for correct configuration of the WiFi network It is not compatible with 5 GHz WiFi networks A WiFi connection can only be established with networks within the 2 4 GHz fr...

Страница 82: ...igure the con trol parameters such as Zero Injection Parameter Status Description Correct Meter Initialisation The Meter has initialised correctly X The Meter has NOT initialised correctly This fault...

Страница 83: ...ows you to enter the necessary fields to create an Account process the registration and to be able to use the application After entering the indicated fields click on Next It is also possible to acces...

Страница 84: ...o salicru com and the subject Equinox Reset password will be sent to that email address 5 The message will include a 6 digit Token code Enter the code enter and confirm the new password and click on C...

Страница 85: ...ill appear in this panel To create a plant press the add button to the right of My plants Fig 11 Creating the plant The Add plant panel will appear Please fill in all required fields Plant Name Plant...

Страница 86: ...Add Then click on Add plant Finally a screen will appear indicating that the Plant has been created successfully and giving a detailed view of the Plant that has just been created Among the available...

Страница 87: ...you can access the real time Synoptic panel of the selected plant where it is possible to navigate through different screens Synoptic panel Daily power curve Energy balance per day per days and per mo...

Страница 88: ...88 SALICRU...

Страница 89: ...89 EN SLC ENERGY MANAGER ENERGY METER USER MANUAL...

Страница 90: ...90 SALICRU It is also possible to access information on installed inverters...

Страница 91: ...91 EN Finally there are several DEMO screens and an application information screen SLC ENERGY MANAGER ENERGY METER USER MANUAL...

Страница 92: ...arried out in accordance with the diagram in section INSTALLATION LECTRIQUE 11 1 1 Configuring the installation on the app Click on the plant that has been created to access its details Addadevicetoth...

Страница 93: ...ice a Entertheunit sserialnumberorscanthedevice sQRcode b Choose the type of connection Ethernet or WiFi c Click on Next 2 Connecting the device via WiFi 3 Connecting the device via Ethernet SLC ENERG...

Страница 94: ...requesting data from each of them and from time to time scanning the bus for newly connected inverters This process can also be enabled via the user interface The EM can also send commands to the diff...

Страница 95: ...cedures for the T S S to intervene in the event of a breakdown 13 2 2 Exclusions SALICRU shall not be bound by the warranty if it finds that the defect in the product does not exist or was caused by m...

Страница 96: ...Embedded website INVERTER Physical layer RS 485 Ports RS 485 Voltage sensor TC sensor LAN WiFi Protocol Modbus Speed 9600 Data bits 8 Stop bit 1 Parity No RELAYS Quantity 2 Rated voltage 250 Vac Rate...

Страница 97: ...NOX2 solar inverter Communication with the EQUINOX2 solar inverter not established Make sure that the Modbus address has been entered correctly in the solar inverter and within the specified range See...

Страница 98: ...as an administrator To do so search for Internet Explorer in the system finder Right click and select the option Run as administrator Accessthepanelinthenormalway Anerrorwindowwillbedisplayed Click on...

Страница 99: ...99 EN SLC ENERGY MANAGER ENERGY METER USER MANUAL...

Страница 100: ...100 08460 Palautordera BARCELONA Tel 34 93 848 24 00 sst salicru com SALICRU COM www linkedin com company salicru salicru_SA Product Range Uninterruptible Power Supplies UPS Stabilisers Lighting Flow...

Страница 101: ...SLC EM Lite SLC EM SLC EM T FR MODE D EMPLOI ENERGY MANAGER...

Страница 102: ...injection et avec N onduleurs en parall le 6 2 5 Sch ma g n ral de branchement du SLC EM triphas avec fonction z ro injection et N onduleurs en parall le 6 3 ALIMENTATION DES DISPOSITIFS 6 3 1 Aliment...

Страница 103: ...TIE 13 2 1 Conditions de la garantie 13 2 2 Exclusions 13 3 R SEAU DE SERVICES TECHNIQUES 14 SP CIFICATIONS TECHNIQUES 15 ANNEXE I INDICATIONS DES VOYANTS ET FONCTIONNEMENT DU DISPOSITIF SLC ENERGY MA...

Страница 104: ...pas tenue responsable des erreurs ou omissions que ce document pourrait contenir Les images qui figurent dans ce document sont fournies titre illustratif et peuvent ne pas repr senter fid lement les...

Страница 105: ...volta que la consommation injection du dansler seau lectriqueet laconsommationdel installation 2 2 UTILISATION DE CE MODE D EMPLOI Ladocumentationrelative quelconque quipementstandardpeut tre t l char...

Страница 106: ...rsonnes et des objets Le non respect des indications fournies peut endommager le dispositif l installation ou les charges Notes d information informations suppl mentaires venant compl ter les proc dur...

Страница 107: ...appliqu es dans le respect des sp cifications des normes harmonis es labor es sur la base des normes de r f rence ci dessous UNE EN CEI 61010 1 2011 A1 2020 R gles de s curit pour appareils lectriques...

Страница 108: ...r proc der l installation des dispositifs m de c ble de communication blind une paire torsad e et poss dant une section de 0 25 mm2 m de c ble r seau L N de m me section que l installation section max...

Страница 109: ...t de contr le de l nergie con u pour g rer l nergie d une installation Il se d cline en trois mod les SLC EM Lite SLC ENERGY MANAGER Lite SLC EM SLC ENERGY MANAGER SLC EM T SLC ENERGY MANAGER T 5 2 VU...

Страница 110: ...sitif 5 3 3 Bornes du dispositif SLC EM T Bornes du dispositif Broche Marque Fonction Mesures de courant L1 Iin R L1 Iin R L2 Iin S L2 Iin S L3 Iin T L3 Iin T Mesures de tension N Neutre L1 Phase 1 L2...

Страница 111: ...if SLC ENERGY MANAGER sur le rail DIN du bo tier de protection de l installation l emplacement m me qui vient d tre lib r Dans le sens allant de l amen e de courant vers l installation placer tout d a...

Страница 112: ...lectrique monophas e ICP IGA ID PIA SLC ENERGY MANAGER CT Fig 6 Branchement lectrique du mod le monophas sans onduleur 6 2 2 Installation lectrique triphas e SLC ENERGY MANAGER ICP IGA IGA ID PIA CT F...

Страница 113: ...s ICP Interrupteur de commande de puissance IGA Interrupteur g n ral automatique ID Interrupteur diff rentiel MCB Interrupteur magn tothermique Magnetic Circuit Breaker Fus Fusibles SPD Dispositif de...

Страница 114: ...nterrupteur de commande de puissance IGA Interrupteur g n ral automatique ID Interrupteur diff rentiel MCB Interrupteur magn tothermique Magnetic Circuit Breaker CNT Contacteur Fus Fusibles SPD Dispos...

Страница 115: ...puissance IGA Interrupteur g n ral automatique ID Interrupteur diff rentiel MCB Interrupteur magn tothermique Magnetic Circuit Breaker Fus Fusibles SPD Dispositif de protection contre lessurtensions...

Страница 116: ...rrupteur de commande de puissance IGA Interrupteur g n ral automatique ID Interrupteur diff rentiel MCB Interrupteur magn tothermique Magnetic Circuit Breaker CNT Contacteur Fus Fusibles SPD Dispositi...

Страница 117: ...ICP MCB MCB Fus Fus SPD SPD Onduleur 2 Onduleur 1 ID ID IGA ID PIA CT L gende des abr viations ICP Interrupteur de commande de puissance IGA Interrupteur g n ral automatique ID Interrupteur diff rent...

Страница 118: ...ositif de protection contre lessurtensions SurgeProtectionDevice PIA Petit interrupteur automatique PV Panneaux photovolta ques SLC ENERGY MANAGER Dispo sitif de surveillance et de contr le de l nergi...

Страница 119: ...voir les afficher dans l application EQX sun 1 Alimentation du dispositif SLC ENERGY MANAGER Le dispositif SLC ENERGY MANAGER est le premier l ment installer apr s l IGA Proc der aux raccordements com...

Страница 120: ...bles de la phase L1 juste apr s l IGA en faisant co n cider la fl che avec le sens suivi par le courant dans l installa tion lors de l nergie est inject e dans le r seau des charges vers l amen e de...

Страница 121: ...faisant co ncider la fl che avec le sens suivi par le courant dans l installation lors de l nergie est inject e dans le r seau des charges vers l amen e de courant IMPORTANT respecter l ordre des phas...

Страница 122: ...torsad e poss dant une section de 0 25 mm2 pour les communications entre l onduleur connecteurs du tableau 1 et le dispositif SLC Energy Manager Puissance de l onduleur C ble 1 4 25 kW 1 2 3 Broche C...

Страница 123: ...asser les c bles par le presse toupe avant de les raccorder Port 2 Onduleur EQX2 T 4 25 kW 1 2 3 vers l onduleur Puissances 33 60 kW Faire passer les c bles par le presse toupe avant de les raccorder...

Страница 124: ...anch de toute source d alimentation qu il s agisse de l alimentation elle m me ou d une source de mesure Le dispositif doit tre install en aval de la protection g n rale de l installation Installer le...

Страница 125: ...SW5 CT 0 0 0 0 1 80 A 100 mA 0 0 0 1 0 200 A 100 mA 0 0 0 1 1 300 A 100 mA 0 0 1 0 0 400 A 100 mA 0 0 1 0 1 600 A 100 mA 0 0 1 1 0 1 000 A 100 mA 0 0 1 1 1 2 000 A 100 mA Tableau 5 Position des micror...

Страница 126: ...ram tres g n raux b Maintenir la touche enfonc e pendant 3 secondes pour acc der au menu suivant Infos syst c Appuyer 13 fois sur ENT jusqu atteindre le menu Adr Modbus Maintenir la touche enfonc e pe...

Страница 127: ...s ci dessous sur l cran de l onduleur Param tres g n raux Limitation de puissance V rifier qu elle est configur e sur l option OFF Param tres g n raux Exportation Configurer 100 Une fois ces deux para...

Страница 128: ...i Fi local l aide des param tres suivants Dans le champ Address saisir une adresse IP comprise entre 192 168 1 50 et 192 168 1 100 les trois premi res valeurs tant fixes et la derni re modifiable de 5...

Страница 129: ...ier en cas de doute 8 3 PANNEAU EMBARQU Ce service permet de surveiller le statut du dispositif distance et en temps r el mais aussi de configurer le r seau de celui ci et de g rer certaines fonctionn...

Страница 130: ...permettant de param trer un serveur proxy Serveurs NTP cran permettant de modifier les serveurs NTP L identifiant engineer permet d acc der un autre cran utilis pour g rer les param tres n cessaires d...

Страница 131: ...ajout des DNS n est pas n cessaire pour param trer le r seau Wi Fi Ledispositifn estpascompatibleaveclesr seauxWi Fide 5 GHz Une connexion Wi Fi ne peut tre tablie qu avec des r seaux situ s dans la p...

Страница 132: ...ction Param tre Statut Description Bonne initialisation du compteur Correct Meter initialization Le compteur s est initialis correctement X Le compteur NE s est PAS initialis correctement Cette erreur...

Страница 133: ...te S enregistrer saisir les champs n cessaires la cr ation d un compte et laisser l application traiter l enregistrement pour pouvoir l utiliser Apr savoirrenseign leschampsindiqu s appuyersur Suivant...

Страница 134: ...tmaster kumo salicru com portant l objet Equinox Reset password est alors envoy cette adresse lectro nique 5 Lecorpsdumessagecontientuncode Token 6chiffres Saisirlecode renseigneretconfirmerlenouveaum...

Страница 135: ...llation appuyer sur le bouton Ajouter affich droite de Mes installations Fig 11 Cr ation d une installation L applicationaffichealorsl cran Ajouterinstallation Compl ter tous les champs obligatoires n...

Страница 136: ...ter Pour terminer appuyer sur Ajouter installation Un message indiquant que l installation a t cr e avec succ s s affiche alors en haut d un cran fournissant une vue d ensemble de l installation qui v...

Страница 137: ...ser d un cran l autre Le bouton permet d acc der au synoptique en temps r el de l installation s lectionn e Cette partie de l application permet de naviguer travers diff rents crans Synoptique Courbe...

Страница 138: ...138 SALICRU...

Страница 139: ...139 FR SLC ENERGY MANAGER ENERGY METER MANUEL D UTILISATEUR...

Страница 140: ...140 SALICRU Il est galement possible d acc der aux informations relatives aux onduleurs install s...

Страница 141: ...141 FR Enfin plusieurs crans de D MO ainsi qu un cran d information sur l application sont disponibles SLC ENERGY MANAGER ENERGY METER MANUEL D UTILISATEUR...

Страница 142: ...e la section 6 2 INSTALLATION LECTRIQUE 11 1 1 Configuration de l installation sur l application Appuyer sur l installation cr e dans l application pour acc der ses informations d taill es Ajouter un...

Страница 143: ...a Saisir le num ro de s rie du dispositif ou scanner son code QR b Choisir le type de connexion Ethernet ou Wi Fi c Appuyer sur Suivant 2 Connexion du dispositif via Wi Fi 3 Connexion du dispositif v...

Страница 144: ...ant Par ailleurs il proc de de temps en temps un scan du bus la recherche de nouveaux onduleurs raccord s Ce processus peut galement tre activ via l interface utilisateur L EM peut notamment envoyer d...

Страница 145: ...e 13 2 2 Exclusions La soci t SALICRU n est pas contrainte d appliquer la garantie s il est constat que le d faut du produit est inexistant ou que celui ci a t provoqu par une mauvaise utilisation par...

Страница 146: ...mbarqu ONDULEUR Couche physique RS485 Ports RS485 capteur de tension capteur TC LAN Wi Fi Protocole Modbus Vitesse 9 600 Bits de donn es 8 Bit d arr t 1 Parit Non RELAIS Quantit 2 Tension nominale 250...

Страница 147: ...olaire EQUINOX2 Communication avec l onduleur solaire EQUINOX2 non tablie V rifier que l adresse Modbus a t correctement saisie dans l onduleur solaire et qu elle est comprise dans la plage sp cifi e...

Страница 148: ...rcher Internet Explorer dans le moteur de recherche du syst me Faire un clic droit et s lectionner l option Ex cuter en tant qu administrateur Acc der au panneau de la mani re habituelle Une fen tre d...

Страница 149: ...149 FR SLC ENERGY MANAGER ENERGY METER MANUEL D UTILISATEUR...

Страница 150: ...lautordera BARCELONE T l 34 93 848 24 00 sst salicru com WWW SALICRU COM FR www linkedin com company salicru salicru_SA Gamme de produits Onduleurs Syst mes d alimentation sans interruption ASI UPS St...

Отзывы: