61
EN
6. INSTALLATION.
6.1. MECHANICAL INSTALLATION.
In this section, the new devices are physically inserted into the
protection panel of the existing installation.
Materials required:
1
1.
Separate the IGA and ID protection elements, leaving
a minimum separation of 48 mm between them.
2.
Place the SLC ENERGY MANAGER device on the DIN rail of
the installation's protection box in the separation space that
has been enabled.
In the direction from the connection to the installation, first
place the SLC ENERGY MANAGER device.
3.
Ensure that the device has the DIN rail retaining tabs inserted
correctly in the lower part.
ICP
IGA
ID
PIAs
SLC ENERGY
MANAGER
Fig. 4. DIN rail installation, single-phase model.
ICP
IGA
ID
PIAs
SLC ENERGY
MANAGER
Fig. 5. DIN rail installation, three-phase model.
SLC ENERGY MANAGER
ENERGY METER
USER MANUAL
Содержание Equinox SLC EM Lite
Страница 1: ...SLC EM Lite SLC EM SLC EM T ES EN FR MANUAL DE USUARIO ENERGY MANAGER...
Страница 38: ...38 SALICRU...
Страница 39: ...39 ES SLC ENERGY MANAGER ENERGY METER USER S MANUAL...
Страница 40: ...40 SALICRU Tambi n es posible acceder a la informaci n de los inversores instalados...
Страница 49: ...49 ES SLC ENERGY MANAGER ENERGY METER USER S MANUAL...
Страница 51: ...SLC EM Lite SLC EM SLC EM T EN USER MANUAL ENERGY MANAGER...
Страница 88: ...88 SALICRU...
Страница 89: ...89 EN SLC ENERGY MANAGER ENERGY METER USER MANUAL...
Страница 90: ...90 SALICRU It is also possible to access information on installed inverters...
Страница 99: ...99 EN SLC ENERGY MANAGER ENERGY METER USER MANUAL...
Страница 101: ...SLC EM Lite SLC EM SLC EM T FR MODE D EMPLOI ENERGY MANAGER...
Страница 138: ...138 SALICRU...
Страница 139: ...139 FR SLC ENERGY MANAGER ENERGY METER MANUEL D UTILISATEUR...
Страница 140: ...140 SALICRU Il est galement possible d acc der aux informations relatives aux onduleurs install s...
Страница 149: ...149 FR SLC ENERGY MANAGER ENERGY METER MANUEL D UTILISATEUR...