76
SALICRU
MCB
MCB
Fus.
Fus.
SPD
SPD
PV
PV
Inverter
Fig. 43. Connection of different solar fields and 2 MPPTs.
Different solar field
refers to those that are made up of
panels from different manufacturers, of different lengths
and/or powers.
4.
Insert the positive and negative connectors into the respec-
tive DC input terminals of the inverter. If the terminals are
properly connected, they will make a clicking sound, as shown
Fig. 44. Connecting the DC input terminals of units with 2 MPPTs.
- Disconnect the AC circuit breaker from the grid side
before connecting the DC input terminals.
- The DC circuit breaker must be "OFF".
- Insulate the unused DC terminals with caps.
5.3.4. Battery system connection.
5.3.4.1. Warnings to consider during the
connection.
1.
Disconnect the AC circuit breaker from the grid part.
2.
Disconnect the DC circuit breaker from the battery part.
3.
Disconnect the inverter DC switch ("Off" position).
4.
Ensure that the maximum input voltage of the battery is
within the inverter limit (180
∼
750 V).
5.3.4.2. Lithium battery connector assembly
procedures.
1.
Select the appropriate DC cable.
Type of
cable
Conductor cross-section (mm
2
)
AVG 10
Outer diameter (mm
2
)
Conductor cross-section (mm
2
)
5,5 - 8,0
4,0 - 6,0
2.
Strip 7 mm of the insulation sleeve of the DC cable, as shown
7 mm
Cable cross-section 5.5-8.0 mm
2
Fig. 45. Wire end stripping.
3.
Use a flat head screwdriver to open the retaining bracket on
the connector, as shown in Fig. 46.
Fig. 46. Opening the retaining bracket.
4.
Insert the stripped DC cable far enough into the battery
connector and change the retaining bracket to make sure it is
locked tightly to the stripped cable, as shown in Fig. 47.
Содержание EQUINOX EQX2 4002-HT
Страница 2: ...2 SALICRU...
Страница 53: ...53 ES EQX2 INVERSORES SOLARES DE CONEXI N A RED MANUAL DE USUARIO...
Страница 56: ...56 SALICRU...
Страница 107: ...107 EN EQX2 SOLAR INVERTERS CONNECTED TO THE GRID USER MANUAL...