84
SALICRU
5.6. GENERAL INSTALLATION DIAGRAM.
ESM1 90D24 EQX2
Fig. 64. Inverter installation diagram.
- Colour code used to represent the distribution and installation
network: BLACK, BROWN or GREY for phases L1, L2 and L3,
and BLUE for the neutral.
- Colour code used to represent the earth cable: YELLOW-GREEN.
- Colour code used to represent the DC power of the installation:
RED for the positive cables and BLACK for the negative cables.
- Colour code used to represent communications between the
installation's units: PURPLE.
In order not to overload the diagram, the earth cables have
only been represented at the earthing connection points of
the protection devices, the inverter and the battery system.
Distribution network
Inverter
installation
AC ON-GRID protections
AC BACK-UP protections
Installation of photovoltaic
panels
PV DC circuit
breakers
In
ver
ter
Battery system
installation
Connection point / Meter
CGMP
(General Control and
Protection Panel)
CMP BACK-UP (BACK-UP
Control and Protection Panel)
BACK-UP
loads
Loads
Содержание EQUINOX EQX2 4002-HT
Страница 2: ...2 SALICRU...
Страница 53: ...53 ES EQX2 INVERSORES SOLARES DE CONEXI N A RED MANUAL DE USUARIO...
Страница 56: ...56 SALICRU...
Страница 107: ...107 EN EQX2 SOLAR INVERTERS CONNECTED TO THE GRID USER MANUAL...