06-2011
Page 39
Salford Farm Machinery Ltd.
2011 699-40' Disc Cultivator Assembly and Parts Manual
24cm
(9")
2cm
(1")
Make sure gang cylinder
masts, turnbuckles, cylinders,
and lugs are in a straight line
before tightening bolts.
Make sure sub-frames
are centered in the gang
mounts before tightening
gang mount 3/4" u-bolts.
No scrapers on
blades next to tongue
(continued from previous page)
6. Hang cylinders (10-13) from masts using 1" x 3 1/4" head pins (17) and 1/4" x 1 1/2"
cotter pins (26). Cylinder locations are shown on gang layout drawing and gang cylinder
hydraulic layout.
Make sure the cylinders are in the proper order across the
machine.
The gang cylinder hoses can be connected at this time following the gang cylinder
hydraulic layout.
7. Attach gang mount sub-frames (6) to bolt-on gang mounts using 1 1/4" x 7" bolts (24)
and 1 1/4" lock nuts (25).
8. Mount cylinder lugs (5) to sub-frames with 5/8" x 4" x 4 1/2" u-bolts (23) and 5/8" lock
nuts (22). Do not tighten bolts yet, leave them loose enough for adjustment.
9. Attach rod end of cylinders to cylinder lugs with 1" x 3 1/4" head pins (17) and 1/4" x
1 1/2" cotter pins (26).
10. Make sure sub-frames are centered in the gang mounts and then tighten gang
mount 3/4" u-bolts.
11. Make sure gang cylinder masts, turnbuckles, cylinders, and lugs are in a straight
line then finish tightening all bolts.
12. Assemble disc gangs on gang tubes (see instructions on following page) and mount
to sub-frames using 3/4" x 6" x 6 1/2" u-bolts (20) and 3/4" lock nuts (21). Do not tighten
bolts yet, leave them loose enough for adjustment. Now attach scrapers to disc gangs.
13. Adjust disc gang positions and tighten all bolts. Leave 2.5cm (1") between disc
blades and tongue. Leave 24cm (9") between main frame and wing disc gang blades.
Scraper tube - see
gang layout for
lengths and locations
Gang tube - see
gang layout for
lengths and locations
quantities vary by machine size
See following pages for c-flex
gang hanger parts and
assembly. Assemble hangers
so they "slant" the same way
as the disc blades
1
4
3
5
7
8
6
2
ITEM NO. PART NO. DESCRIPTION
1
D10018R DISC SCRAPER BLADE - RIGHT
2
D10018L
DISC SCRAPER BLADE - LEFT
3
BU0820
1/2" x 2 x 3 U-BOLT
4
BN08L
1/2" NYLOCK NUT NC
5
D10042
DISC SCRAPER HANGER
6
BU1061
U-BOLT 5/8" x 6" x 5 1/2"
7
BU1020
5/8" x 2 x 3 1/2" U-BOLT
8
BN10L
5/8" NYLOCK NUT NC
1. Assemble the gang hangers as shown on the following pages and mount gangs to gang
tubes. See gang layout drawing for gang tube lengths and locations.
2. Mount gang tubes to gang mount sub-frames before attaching scrapers.
3. Attach the scraper mounts (4) to the gang tubes 5/8" x 6" x 5 1/2" u-bolts (5) and 5/8" lock
nuts (7). See gang layout drawing for scraper mount locations.
5. Mount scraper tubes to mounts using 5/8" x 2" x 3 1/2" u-bolts (6) and 5/8" lock nuts (7).
See gang layout drawing for scraper tube lengths and locations.
6. Attach scrapers (1) to scraper tubes using 1/2" x 2" x 3" u-bolts (2) and 1/2" lock nuts (3).
Note: there are no scrapers on the blades next to the tongue.
DISC GANG ASSEMBLY AND SCRAPER INSTALLATION
Disc Gang Assembly and Scraper Installation