background image

PERFORMANCE VERIFICATION 

XFVP probes are shipped from Saker and both probe head and receiver are tested as a system 
and adjusted to meet the DC gain, offset and frequency specifications. Accuracy is 
automatically maintained by two internal precision voltage references and a software algorithm 
so there is no provision for manual user adjustment. If the probe fails repeatedly to calibrate 
with a properly terminated scope, it must be returned to Saker for inspection. The 
recommended calibration interval for the model XFVP is two years. 

Equipments needed to perform verification: 

-

Bench Multimeter of at least 5.5 digits, AC and DC accuracy better than 0.1% (Keysight 
34450A or similar) 

-

Adjustable power supply or precision voltage source 

-

Banana to BNC cable (Pomona 4531 or similar) 

-

BNC-SMB adapter (Amphenol 242185 or similar) 

-

BNC-BNC cable (Caltest CT2942 or similar) 

-

50 Ohm terminator (Pomona 3285 and Amphenol 202104) 

-

BNC to banana Jack adapter (Caltest CT2939 or similar) 

Functional check 

The functional check verifies  the basic operation of the probe functions: 

-

Turn on both emitter and receiver. 

XFVP MODEL

XFVP SERIAL NUMBER #

DATE

MEASURES TAKEN BY

Model

Serial #

Calibration date

BENCH MULTIMETER

POWER SUPPLY/
VOLTAGE SOURCE

* Does not need calibration 

since measurements are 

carried out with the DMM

BR-XFVP-Rev 6. 12/22

www.saker-mv.com

Содержание XFVP10-2

Страница 1: ...User Manual XFVP Medium Voltage Fiber Isolated Voltage Probe Revision 6 BR XFVP Rev 6 12 22 www saker mv com...

Страница 2: ...l accuracy as compared to other optical equipment and saves lots of setup time during research and testing Moreover the XFVP probe can do hot calibrations with no input disconnect which translates int...

Страница 3: ...can be floated at very high voltages please consider all clearances before making any measurements Do not open the probe head or receiver they do not contain user serviceable parts inside Fiber cable...

Страница 4: ...0 65 C Operating temperature receiver 0 70 C ESD EMI standards IEC61000 4 2 61000 4 3 CE certi cation GPSD 2001 95 EC EMC Directive 2014 30 EU RoHS2 2011 65 EU 1 Specs for XFVP20 model 2 3dB small si...

Страница 5: ...mination is needed to provide appropriate high frequency transmission of the signal If the oscilloscope does not have internal 50 termination an optional BNC terminator code XFVPTERM can be supplied I...

Страница 6: ...of IEC EN 61010 031 RECEIVER OSCILLOSCOPE CONNECTION A BNC BNC cable is supplied to connect the receiver to a measuring oscilloscope Use of a good quality cable is recommended as it could affect the m...

Страница 7: ...ead or the receiver press the TURN ON button until the ON Led lights It takes a short press to turn on the units If the probe head fails to turn on check if the batteries are dead and replace them The...

Страница 8: ...emitter It is recommended to use this feature every time the probe is not in use even for shorts periods of time Since the probe head can be set into low power mode remotely from the receiver potenti...

Страница 9: ...boots since these protect the connectors from dust and maintain the necessary alignment for proper accuracy CALIBRATION Calibration is needed to adjust the analog parameters of the fiber optic link a...

Страница 10: ...icator on the measured line that provides visual and clear indication about the presence of potentially dangerous voltages SAKER offers the MVD and MVDZ series of medium voltage presence detectors LOW...

Страница 11: ...n cleaning the exterior Dry the probe before making any voltage measurements The probe is not waterproof The fiber cables should never be disconnected The boots in the cables protect the connectors fr...

Страница 12: ...m verification Bench Multimeter of at least 5 5 digits AC and DC accuracy better than 0 1 Keysight 34450A or similar Adjustable power supply or precision voltage source Banana to BNC cable Pomona 4531...

Страница 13: ...ne batteries in the transmitter Turn on the probe head and receiver press CAL and wait 5 minutes before starting the tests OFFSET Veri cation This test can also be performed with a short at the SMB pr...

Страница 14: ...cking generator and at least 1GHz capability 1 Set the output level of the tracking generator to 5dBm 2 Set the horizontal sweep from 1MHz to 500MHz log sweep 3 Place a jump cable from output of track...

Страница 15: ...tic Emissions IEC EN 55011 A1 2011 Radiated Emissions 30 1000 MHz Class B Electromagnetic Immunity IEC EN 61000 4 2 2010 Electrostatic Discharge 4 kV contact 8 kV air IEC EN 61000 4 3 2007 RF Radiated...

Отзывы: