MULTILUBE
INSTALLATION AND MAINTENANCE
HINS4AEN.doc
24.08.2006 Rev. 4A
1 (18)
MULTILUBE –SYSTEM INSTALLATION AND MAINTENANCE
1 PUMPING UNIT INSTALLATION
1.1 Installing the supporting blocks and the pumping unit
Note
Free space is required below the pumping unit for maintenance procedures.
See dimensional drawings 361034B and 361035B.
Installing the supporting block of pumping unit models MLP-4-X-XX-XX-XX:
1. Determine the location of the supporting block with the help of the dimensional drawings.
2. Install the supporting block in its place with cotter bolts M8x75 or with hexagonal screws
M8 (4 pcs) (Figure 1).
3. Install 2 pcs M8x25 hexagonal screws on the other side of the block.
4. Lift the pumping unit on the wall on the M8 hexagonal screws.
5. Install 2 pcs M8 hexagonal screws on the other side of the block.
6. Fasten the pumping unit on the supporting block by tightening the M8 hexagonal screws (4
pcs).
Figure 1.
Supporting block installed on a wall
Hex.
screw
M8x25
Cotter bolt M8x75 or
hex. screw M8 (4 pcs)