MINUTO 05 TROUBLESHOOTING
Page / 46
Start condition
Start condition
Press the Z1 button to open the Electro Valve
Press the Z1 button to open the Electro Valve
IMPORTANT NOTE: If the DREGDRAWER is not inserted or the DOOR is not
IMPORTANT NOTE: If the DREGDRAWER is not inserted or the DOOR is not
closed the EV test cannot be performed. If these 2 inputs are not in the
closed the EV test cannot be performed. If these 2 inputs are not in the
right position, a warning message will be shown and the display turns to
right position, a warning message will be shown and the display turns to
yellow.
yellow.
Press the Z4 button to switch on the pump
Press the Z4 button to switch on the pump
The water goes out from the pipe and the indication
The water goes out from the pipe and the indication
IMP
IMP
shows
shows
increasing numbers. The indication L/H must be within the range 10-18.
increasing numbers. The indication L/H must be within the range 10-18.
It is possible to hear the “click” from Electro Valve. The indication beside
It is possible to hear the “click” from Electro Valve. The indication beside
the
the
EV1
EV1
changes from “OFF” to “ON”.
changes from “OFF” to “ON”.
ERROR:
ERROR:
The display backlight changes from green to red and the impulse
The display backlight changes from green to red and the impulse
remains 0; If water comes out the pipe: check the wiring from the
fl
owmeter
remains 0; If water comes out the pipe: check the wiring from the
fl
owmeter
to the CPU/POWER board (JP5). If no water comes out the pipe: check the
to the CPU/POWER board (JP5). If no water comes out the pipe: check the
pump and the wiring from the pump to the CPU/POWER board (JP24).
pump and the wiring from the pump to the CPU/POWER board (JP24).
ERROR:
ERROR:
The L/H is zero or very low; the Electro Valve does not
The L/H is zero or very low; the Electro Valve does not
open. Check the wiring from the Electro Valve to the CPU/POWER
open. Check the wiring from the Electro Valve to the CPU/POWER
board (JP3) and the Electro Valve.
board (JP3) and the Electro Valve.
The grinder rotates and in the indication GRINDER the number increasing
up to 40. The other numbers inside the GRINDER box are not important for
this test.
Press the Z4 button to switch on the grinder
Press the Z4 button to switch on the grinder
IMPORTANT NOTE: If the COFFEE BEANS Cover is not inserted the Grinder
test cannot be performed in 120V. If this input is not in the right position, a
warning message will be shown and the display turns to yellow.
ERROR:
ERROR:
The number remains 0 or the grinder does not run, the display
The number remains 0 or the grinder does not run, the display
backlight changes from green to red; check the Hall sensor board of the
backlight changes from green to red; check the Hall sensor board of the
Grinder, the Grinder, the wiring from the Hall sensor board to the
Grinder, the Grinder, the wiring from the Hall sensor board to the
CPU/POWER board (JP2) and the wiring from the Grinder to the
CPU/POWER board (JP2) and the wiring from the Grinder to the
CPU/POWER board (JP8)
CPU/POWER board (JP8)
Initial status
Initial status
Operational check - solenoid valves and pump
Press STAND_BY “
Press STAND_BY “
” to move to the next screen
” to move to the next screen
Operational check - coffee grinder and boiler
27
Содержание Minuto
Страница 3: ...MINUTO CHAPTER 1 INTRODUCTION...
Страница 10: ...MINUTO CHAPTER 2 TECHNICAL SPECIFICATIONS...
Страница 16: ...MINUTO CHAPTER 3 USER INSTRUCTIONS...
Страница 30: ...MINUTO CHAPTER 4 OPERATING LOGIC...
Страница 41: ...MINUTO CHAPTER 5 TROUBLESHOOTING...
Страница 88: ...MINUTO CHAPTER 6 STANDARD CHECKS...
Страница 91: ...MINUTO CHAPTER 7 DISASSEMBLY...
Страница 101: ...MINUTO CHAPTER 8 NOTES...
Страница 102: ...MINUTO 08 NOTES Page 01 01...
Страница 103: ...MINUTO CHAPTER 9 WATER CIRCUIT DIAGRAM...
Страница 107: ...MINUTO CHAPTER 10 ELECTRICAL DIAGRAM...
Страница 108: ...MINUTO 10 WIRING DIAGRAM Page 02 01 Minuto Cappuccino Focus and Class...
Страница 109: ...MINUTO 10 WIRING DIAGRAM Page 02 Minuto Pure 02...