MINUTO 05 TROUBLESHOOTING
Page / 46
Press the Espresso button to move BU to work
Action by user
LED INDICATION
Led
NoBeans
Led
NoWater
Led
GenAlarm
Led
Dreg
When the BU reaches the work position the
Led NoBeans is switched on
ON
NA
NA
NA
ERROR: Led NoBeans remains off, Check the work mi-
croswitch (broken?), the BU motor (blocked?) and the wi-
ring (JP16).
NA
NA
NA
NA
Press the Espresso button to move BU to Home
Action by user
LED INDICATION
Led
NoBeans
Led
NoWater
Led
GenAlarm
Led
Dreg
When the BU leave the work position the Led
NoBeans is switched off, and BU move to
Home Position to end L4 Test
OFF
NA
NA
NA
Press the Coffee button to switch on the Pump
Action by user
LED INDICATION
Led
NoBeans
Led
NoWater
Led
GenAlarm
Led
Dreg
The water goes out from the dispensing spout,the NoWa-
ter LED blink every Flowmeter pulse
NA
BLINK
NA
NA
ERROR: the NoWater LED does’t
fl
ashing
and after 5sec this LED Switch ON; check:
1) the BU is in work position,
2) pump,
3) the
fl
owmeter,
4) the wiring from the
fl
owmeter to the CPU/POWER bo-
ard (JP5)
5) the wiring from the pump to the CPU/POWER board
(JP24)
NA
ON
NA
NA
Finish condition:
With BU, Drag Drawer,
door closed
LED INDICATION
Led
NoBeans
Led
NoWater
Led
GenAlarm
Led Dreg
OFF
OFF
OFF
OFF
Level 5 (Grinder-Heater)
Start condition:
NO BU, NO drag drawer,
door open and No Water sensor
LED INDICATION
Led
NoBeans
Led
NoWater
Led
GenAlarm
Led
Dreg
OFF
OFF
OFF
OFF
Press BUTTON ON/OFF to move to the next screen
Press BUTTON ON/OFF to move to the next screen
35
Содержание Minuto
Страница 3: ...MINUTO CHAPTER 1 INTRODUCTION...
Страница 10: ...MINUTO CHAPTER 2 TECHNICAL SPECIFICATIONS...
Страница 16: ...MINUTO CHAPTER 3 USER INSTRUCTIONS...
Страница 30: ...MINUTO CHAPTER 4 OPERATING LOGIC...
Страница 41: ...MINUTO CHAPTER 5 TROUBLESHOOTING...
Страница 88: ...MINUTO CHAPTER 6 STANDARD CHECKS...
Страница 91: ...MINUTO CHAPTER 7 DISASSEMBLY...
Страница 101: ...MINUTO CHAPTER 8 NOTES...
Страница 102: ...MINUTO 08 NOTES Page 01 01...
Страница 103: ...MINUTO CHAPTER 9 WATER CIRCUIT DIAGRAM...
Страница 107: ...MINUTO CHAPTER 10 ELECTRICAL DIAGRAM...
Страница 108: ...MINUTO 10 WIRING DIAGRAM Page 02 01 Minuto Cappuccino Focus and Class...
Страница 109: ...MINUTO 10 WIRING DIAGRAM Page 02 Minuto Pure 02...