ENGLISH
18
9. CHECKS PRIOR TO PUTTING INTO SERVICE
THE PUMP SHOULD NEVER BE ALLOWED TO OPERATE OFF LOAD
Check that the voltage and frequency of the incoming mains electricity supply correspond to those on the pump’s
specification plate.
Unscrew the transparent pre-filter cover and fill the pre-filter with water until the water level reaches the suction hole.
Replace the pre-filter cover and hand-tighten only, ensuring that it is fully tightened.
Check the pump shaft is able to freely rotate.
Check the that the direction of motor rotation corresponds with that indicated on the
specification plate (the fan should rotate in a CLOCKWISE DIRECTION, when viewed from
the rear of the motor. If the motor is three-phase and it is observed that it is rotating in
the opposite direction, then two of the supply phases should be inverted at the protection
panel.
10. PUTTING INTO SERVICE
Open all valves, both suction and impulsion, and switch on the pump.
Wait a reasonable time for the pump and suction piping to self-prime. If this takes too long, then the priming
process should be repeated.
Once the pump has correctly self-primed and the pre-filter body is seen to be full of water, the motor current should
be checked and the thermal relay adjusted appropriately.
11. MAINTENANCE, DISMANTLING AND RECYCLING
The most important maintenance operation is that of keeping the pre-filter basket clean, and this filter state
check should be performed after each filtration operation and especially after bottom-cleaning. The procedure
is as follows:
Disconnect the electricity supply to the pump. Close the suction and impulsion valves to the pump. Open the pre-filter
cover, remove the basket and clean it. Once it is clean, replace it, but before closing, check the condition of the pump
body thread, pre-filter cover and the O-ring, cleaning them only with water, and where necessary apply a light coating
of neutral Vaseline.
The pump should only be dismantled by qualified personnel who hold the technical qualifications required under the
technical safety regulations of the country where the product is located.
This product and its components must be disposed of in accordance with environmental regulations. Use local public
or private waste-collection systems.
Содержание OPTIMA
Страница 87: ...PYCCK PYCCK 85 1000 3 1 2 5...
Страница 88: ...PYCCK 86 6 OK NO...
Страница 89: ...PYCCK PYCCK 87 3 230 V 400 V W2 U2 V2 W1 V1 U1 R S T R S T W2 U2 V2 W1 V1 U1 1...
Страница 90: ...PYCCK 88...
Страница 91: ...PYCCK PYCCK 89...
Страница 92: ...PYCCK 90 12 1 RUN SWIMMING POOL PUMP CONTROLLER...
Страница 93: ...PYCCK PYCCK 91 12 2 12 3 12 4 ELEKTRICK ZAPOJEN 220 240 220 240 50 60 16 IP 55 220 16 220 50 60...
Страница 94: ...PYCCK 92 12 5 12 6 P M 7 h 6 1 a 4 o e a p 12 7 3...
Страница 95: ...PYCCK PYCCK 93 PT 100 12 8 a b DD MM YYYY c HH MM 12 9 1 2 F2 C 8 P H H 0 1 3 3 C 1 A A 4 4 0 7 R 1 U 6 2 2...
Страница 96: ...PYCCK 94 OK 3 FILTRACION OFF 1 3 12 4 10 5 3 12 F2 F2 F2 F2 F1...
Страница 97: ...PYCCK PYCCK 95 6 XX DD MM YY XX OL DR DD MM YY 7 ALARM SKIMMING 3 8 9 F2 F2...
Страница 98: ...PYCCK 96 3 3 PT 100 1 59 3 C 55 5 30 C 10 11 1 2 15 3 10...
Страница 99: ...PYCCK PYCCK 97 H A C O C 6 0 M F1 F1 11 2 5 30 60 2 4 8 F2...
Страница 100: ...PYCCK 98 15 30 60 2 4 8 12 12 PT100 a 2 5 220 110 60 35 1 5 130 60 30 15 1 40 25 0 25 0 33 0 5 0 75 1 1 5 2 3 mm2 5 M 1...
Страница 101: ...PYCCK PYCCK 99 b PT100 PT100 PT100 ENTRADA ON 9 ENTRADA SALIDA 9 12 13 24 12 14...
Страница 102: ......
Страница 134: ...1 18 16 21 20 19 4 3 2 29 31 32 17 30 33 28 27 26 25 24 23 22 8 9 10 11 12 13 14 5 6 15 7 25 33 50 75 100...
Страница 136: ...50 75 100 150 200 300 15 14 13 12 13 15 16 14 13 12 18 19...