
Saberz Project
M Chassis Installation Guide
R
ECHARGE
P
ORTS
(RCP
S
)
Version 1.9.5_b
–
September 18, 2022
•
Page 8
5
Recharge Ports (RCPs)
5.1
Preparation
-
Remove the metal bracket from the front of the RCP and discard. This part easily pops right off.
-
Carefully shave off the small plastic tabs located towards the front of the RCP:
-
Test fit the RCP into the chassis.
5.2
Wiring and Installation
Important!
Be sure to plan on soldering the wires on the RCP in the direction seen below. It is very important the wires are
oriented this way once the RCP is installed into the chassis: