Chapter 4 Starting and Configuring Router
Installation Manual
4-2
4.1.2.2
Powering on Router
Turn on the power switch of the router.
Turn the router to the power on position.
4.1.2.3
Check after Power-on
After powering on the router, please check
Whether the cooling system is normal
When the RSR20-14,RSR20-18 and RSR20-24 router with the fan is powered on, you
will hear the fan working. Put your hand near the air vent hole, you will feel the
movement of air.
If the indicators on the front panel of the router are operating normally.
Check procedure: For RSR10-02 and RSR20-04, when the router is powered-on, the
Status indicator should be solid green when the router is working normally. For
RSR20-14, RSR20-18 and RSR20-24, when the router is powered-on, the System
indicator should be solid green when the router is working normally.
Whether the configuration terminal displays normally
When the router is powered on, information on router software self-decompression will
appear on the terminal display.
4.1.3
Startup Process
When the router is started for the first time, the following information appears
***********************************************
System bootstrap ...
Boot Version: RGOS 10.3(4), Release(53498)
Nor Flash ID: 0x00010049, SIZE: 2097152Bytes
MTD_DRIVER-5-MTD_NAND_FOUND: 1 NAND chips(chip size : 33554432) detected
MTD_DRIVER-5-MTD_NAND_FOUND: 1 nand chip(s) found on the target.
Press Ctrl+C to enter Boot Menu ......
Main Program File Name rgos.bin, Load Main Program ...
Executing program, launch at: 0x00010000
Ruijie General Operating System Software
Release Software (tm), RGOS 10.3(4), Release(53498), Compiled Fri Apr 3 08:45:59 CST
2009 by ngcf31
Содержание RSR10 Series
Страница 1: ...Ruijie RSR10 RSR20 Series Routers Hardware Installation Manual V2 00...
Страница 10: ......
Страница 78: ......
Страница 84: ......
Страница 96: ......