Hoist & Sub-frame Installation cont.
Rugby Manufacturing 1841488C | 13-Jul-20 Page 11
101010P1010101101010
Rugby Manufacturing SR-Series Hoist Manual
7.
Slide a lock collar onto each lifting shaft, and then slide the shafts into each end of the upper
hoist tube (
Figure 13
).
8.
Install a body guide plate onto each sub-frame rail using one of the sets of bolt holes provided.
Fasten guides using the supplied hardware.
Figure 13