Rugby Manufacturing 1841488C | 13-Jul-20 Page 8
Rugby Manufacturing SR-Series Hoist Manual
Hoist & Sub-frame Assembly cont.
4.
Position a provided 3/8” spacer under each sub-frame rail as far forward as possible. Secure to
rail by welding as shown. (
Figure 8)
NOTE: Optional 12” or 24” bolt-on sub-frame extensions can be installed to convert the 9’ subframe to a
10’ or 11’ as required. For optional 45° dump angle applications, refer to the
45° Application Sub-frame
Modification
section.
Hoist & Sub-frame Installation
1.
Position the assembled hoist & sub-frame onto the truck frame using the application chart
shown in (
Figure 9
).
Figure 8
Figure 9