OPERATION & MAINTENANCE MANUAL

 

CompactFreezer

 

 

17 

 

5.1.

 

ELECTRICAL WIRING CONNECTIONS

 

 

Typically, a single 2” conduit will be required to connect the cabinet on

 the  freezer.  Consult  the  wiring 

diagrams  inside  the  control  box  for  proper  sizing  and  location.  For  trouble

fee  operation  of  the 

temperature control system, the shielded cable for the RTD sensors  should be run in a separate conduit 
away from control and power wiring 
 

 

 

 

In Control Box and Apparatus Boxes (control panels mounted on wall)

 

 

A.

 

Mixed voltages (AC or DC) from 110V up to 600 volts can be bundled and run together 
without any appreciable problems. 

 

B.

 

Signal  wires  (usually  shielded  cable)  must  be  run  separately  from  the  higher  voltage 
wires as far away as possible, and no closer than 6 inches.  If the wires must cross each 
other,  they  should  do  so  at  90°.  Terminal  lead  lengths  should  be  as  short  as  possible 
with shielding grounded at one end only, preferably at the controller end. The location 
of the controller and shielded wire should be as remote as possible relative to any AFC 
generating unit controller to prevent pick

up of RF noise.  Six inches is too close. 

 

1.

 

Earth Ground 

 

Earth ground must be attached to the unit’s chassis to make

  it 

noise free 

 

2.

 

Neutral 

 It is necessary to assure that neutral is at, or near, ground potential. 

A voltmeter check between neutral and ground should show no more than  50 
millivolts. 

 

In Conduit, Pipe or EMT

 

 

A.

 

Control  wires  (115V)  and  power  wires  up  to  600  volts  (including  DC)  can  be  contained  in  the 
same conduit unless specified otherwise by local code regulation! This conduit terminates on  a 
designated apparatus box, usually the number 1 module. 

 

B.

 

Signal wires for the RTD temperature probes (very low voltage and amperage). In our case, this is 

the 3‐wire shielded cable which must be run in its own conduit. Each conduit should

 originate 

from each apparatus box that contains a probe, and rise vertically to normal ceiling height where 
these conduits may junction for the main signal run to the control cabinet. Keep at least 6 inches 
from other conduits. 

 
 

5.2.

 

LN

SUPPLY CONNECTION

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

 

 

 

 lock out/tag out (

 

 

Содержание COMPACT FREEZE TUNNEL

Страница 1: ...tenance Manual COMPACT FREEZE TUNNEL Liquid Nitrogen Cryogenic Freezer For service or support please call RS CRYO EQUIPMENT INC 629 Grove Street Manteno IL 60950 Phone 815 468 6115 Fax 815 468 2651 ht...

Страница 2: ...1 3 8 Temperature Control System 11 4 Installation Assembly 12 4 1 Site SelectionRequirements 12 4 2 Unloading the Compact Freezer 13 4 3 Positioning the Freezer 13 4 4 Connecting Freezer Sections and...

Страница 3: ...9 3 Conveyor and Conveyor Drive 35 9 4 Safety Relief Valves 36 9 5 Module Joints 36 9 6 Solenoid Valves 36 9 7 Strainer 36 9 8 Doors 36 9 9 Headers and Orifices 37 9 10 Temperature Controller 38 9 11...

Страница 4: ...re that all separately packed items exhaust spare parts bolts etc have beenreceived If there is any damage all claims must be made promptly to the shipping company The RS Cryo Equipment representative...

Страница 5: ...llows humid air into the freezer and may cause the system to freeze up Never reach inside the freezer when it is running Doing so may result in bodily injury from cold burns Never leave the freezer un...

Страница 6: ...o ensure the proper removal of nitrogen vapor To re start freezer turn the fan conveyor and instrument power buttons to the off position Once all three are OFF then turn each back to the on position F...

Страница 7: ...to increase Unless this pressure can bleed back into the supply tank or out a safety relief valve it may burst the line Safety relief valves should be piped to an outside area Always open valves slow...

Страница 8: ...OPERATION MAINTENANCE MANUAL CompactFreezer 7 3 About the Compact Freezer 3 1 EQUIPMENT SPECIFICATIONS COMPACT FREEZER FREEZER MODULES LENGTH 1 83 2 122 3 161 38 38 7 40 48 120V SINGLE PHASE 35AMP...

Страница 9: ...duct heat load If the product flow stops the freezer automatically reduces the liquid nitrogen injection rate to the minimum required to maintain the freezer operating set point temperature A key erro...

Страница 10: ...OPERATION MAINTENANCE MANUAL CompactFreezer 9 warm outer surfaces of the parts to keep cooling losses to a minimum All fasteners...

Страница 11: ...erials approved by inspection agencies for use as food contact surfaces The upper and lower doors open on each side of the freezer to fully expose the inside for ease of cleaning 3 4 CONVEYOR S BELT S...

Страница 12: ...n motor push button station 1 per freezer for variable speedfans 2 Conveyor drive push button station 1 per drive 3 Instrument power push button station 4 Exhaust blowers push button station 5 Tempera...

Страница 13: ...hat require the use of extension headers have piping run to either the preceding or following module with a duplicate header system in those modules For optimal freezing capacity the Compact Freezer t...

Страница 14: ...fully map out the path to the installation area prior to unloading the Compact Freezer from the truck Determine the most suitable freezer orientation to pass through all bottle necks and to assure cor...

Страница 15: ...r must be unloaded by means of a crane or forklift The recommended means of transport is on industrial rollers if a crane or forklift can not be used Ensure that the total weight of the freezer does n...

Страница 16: ...end only The first module of the second crate should be positioned to extend about 2 onto the exposed pedestal half mounting surface F Uncrate the modules G Coat to inner mating surface of modules wi...

Страница 17: ...drive sprockets teeth areengaged Install scraper belt at exit end of top belt and adjust it just short of touching the bet Do the same for exit chute on bottom belt 4 6 LEVELING THE FREEZER The freeze...

Страница 18: ...e installation drawing for each blower mounting is forwarded to the customer to pass on to his installation contractor who is normally responsible for mounting and connecting the exhaust to the trough...

Страница 19: ...cation of the controller and shielded wire should be as remote as possible relative to any AFC generating unit controller to prevent pick up of RF noise Six inches is tooclose 1 Earth Ground Earth gro...

Страница 20: ...source of liquid nitrogen from a storage tank The liquid nitrogen supply piping connects the storage tank with the liquid nitrogen injection system of the freezer Insulate all liquid nitrogen piping u...

Страница 21: ...his will allow for proper exhaust system performance and reduce negative pressure in the production area Protect the exit of the exhaust system against bad weather conditions and or birds Minimize the...

Страница 22: ...ezer Room air can bring moisture into the freezer therefore affecting the efficiency and economical operation of the freezer 6 Initial Start up and Tuning The Cabinet Freezer was factory tested before...

Страница 23: ...control panel are OFF 9 With the main disconnect in the OFF position use a multi meter to check that the proper voltages and amperage is supplied to the control panel 10 Open the main shut off valve a...

Страница 24: ...nveyor at approximately a 45 angle 6 3 OPERATING TEMPERATURE The normal operating temperature of the Cabinet Freezer tunnel can be adjusted from 50 F to 125 F 10 C to 120 5 C for most products for opt...

Страница 25: ...slowest speed that will handle the required production and then increase the freezer operating temperature to the warmest temperature that will produce the desired results This is the most economical...

Страница 26: ...e running daily 2 Check solenoid valve operation at least weekly 3 Check conveyor belt slack frequently 4 Change conveyor drive gear box oil as specified in component manual 7 2 DAILY START UP AND OPE...

Страница 27: ...king the residence time The speed of the in feed and discharge conveyors should be matched to assure a smooth product transfer 10 Check that the liquid nitrogen is injecting into the freezer This star...

Страница 28: ...he conveyor In this case the temporary shutdown would be to turn off instrument power the fans and the conveyor C Three or four minutes before restarting production start the fan motors and conveyors...

Страница 29: ...e frozen shell Equilibration occurs in the package where the refrigeration of all pieces compliments eachother 7 6 SHUTDOWN At the end of a production shift the freezer should be shut down in the foll...

Страница 30: ...rotect electrical components from water moisture damage with plastic bags if possible Wear gloves and safety glasses to avoid personal injury from high pressure hot water or steam jets Remove or secur...

Страница 31: ...freezer as dry as possible It is recommended that with all power off both the upper and lower doors be left open until the next productionshift 10 Any removable parts that were taken off the freezer...

Страница 32: ...l accessory not included with allunits 9 2 CONVEYOR AND CONVEYOR DRIVE Conveyor Belt Inspect the belt daily for the first several days of operations and semi monthly afterwards A tensioning device is...

Страница 33: ...conditions Conveyor Drive Gear Reducer Change oil after every 1 000 hours of operation Use Mobil 600W cylinder oil or equivalent 9 3 SAFETY RELIEF VALVES Safety Relief Valves should be located between...

Страница 34: ...hold down strip and screws Do not force the screwstight Door Safety Switch The adjustment of the door safety switch actuation is done in the followingsequence 1 Make sure power is turned OFF 2 Loosen...

Страница 35: ...tion The lower limit set point is programmed to not exceed 125 F 130 C but can be reprogrammed for warmer or colder limits if the situation warrants it Control functions alarm settings and other param...

Страница 36: ...rom inside the apparatus box and free the cable 2 Remove fan blade by first loosening the two cross bolts on it Remove hex cap screw and thrust washer and slide fan blade and key off the shaft 3 Remov...

Страница 37: ...z electrical power supply Use the electrical schematic in Appendix B Reference Drawings for more information with respect to the voltage requirements and other specifications The variation in supply v...

Страница 38: ...order Check if the emergency stops have been activated Reset if necessary Check if the main fuses of the drive motor belt are intact If the conveyor belt does not run at a smooth uniform speed check...

Страница 39: ...jection of LN2 Reduce number of nozzles in sensor area Valve may need throttling Reduce pressure of tank Injection too close to sensor Change location of nozzle Ice build up around nozzle causing dire...

Страница 40: ...ce each if necessary Jammed conveyor belt motor hums Press the E stop button check for jam and correct cause Belt drive not activated Activate belt drive Emergency stop is activated Pull to reset the...

Страница 41: ...speed Exhaust fan not running Exhaust system not switched on Activate exhaust system Circuit breaker of motor failed Reset breaker No LN2 injection LN2 injection not activated Start LN2 injection Tank...

Страница 42: ...Shaft Fan 30 570263 Coupling Fan Shaft Split 5 8 I D 30 570354 Bearing Fan Shaft 30 550561 Sleeve Bearing 30 570303 Fan Blade P1171 High Pitch 30 570207 Fan Blade P1179 Low Pitch 11 2 CONTROL CABINET...

Страница 43: ...er Part Description 30 570010 LN2 Injection Solenoid Valve 30 570360 Sensor Temperature RTD type 30 570004 Motor Conveyor Drive 1 3HP 30 550491 Gasket Door Curved Spun Polyester 30 550490 Gasket Door...

Страница 44: ...OPERATION MAINTENANCE MANUAL CompactFreezer 42 12 Appendices Appendix A Liquid Nitrogen MSDS...

Страница 45: ...OPERATION MAINTENANCE MANUAL CompactFreezer 43 Appendix B Reference Drawings...

Страница 46: ...OPERATION MAINTENANCE MANUAL CompactFreezer 44 Appendix C Component Manuals...

Отзывы: