OPERATION & MAINTENANCE MANUAL
CompactFreezer
15
4.5.
INSTALLATION OF THE CONVEYOR BELT
Pull the belt through the return track leaving the final 6 to 8 feet still in the pile. This is enough belt to
fold over the drive sprockets and splice the conveyor. The conveyor is free to move until the drive
sprockets teeth are engaged.
Install scraper belt at exit end of top belt and adjust it just short of touching the bet. Do the same for
exit chute on bottom belt.
4.6.
LEVELING THE FREEZER
The freezer should be re
‐
leveled and readjusted after the conveyor is installed. The two threaded
plastic legs on the bottom of each pedestal should be adjusted out so that they will clear the floor by
about 3
‐1/2”
for ease of cleaning. The
customer’s
infeed equipment may actually determine the final
Содержание COMPACT FREEZE TUNNEL
Страница 44: ...OPERATION MAINTENANCE MANUAL CompactFreezer 42 12 Appendices Appendix A Liquid Nitrogen MSDS...
Страница 45: ...OPERATION MAINTENANCE MANUAL CompactFreezer 43 Appendix B Reference Drawings...
Страница 46: ...OPERATION MAINTENANCE MANUAL CompactFreezer 44 Appendix C Component Manuals...