Commissioning
7.1 Prerequisites
Before commissioning and before the electrical voltage is con-
nected, all short-circuit-proof bypasses at insulators and mobile
earthing fittings must be removed.
7.2 Putting into operation
Commissioning normally takes place according to a commissioning
programme created in accordance with the owner’s processes and
adapted to the local situation; it can also include dynamic test runs
along the contact line installation.
Commissioning
Putting into operation