background image

6 Hand-over to the user

Installation manual

25

R2CND0 R2TND012~024A4AA
Wall-mounted condensing boiler
3P469346-4E – 2017.07

a

e

f

g

c

b

d

a

Left dial

b

LCD screen

c

Right dial

d

Mode / Reset

e

Status indicator

f

Cancel / Back

g

Menu / Enter

1

Make  sure  the  system  is  filled  with  water  and  fully  vented  as
described in this manual.

2

Check that the central heating and domestic hot water isolating
valves are open.

3

Check that gas service valve is open.

4

Connect  the  unit  to  the  main  power  supply.  The  user  interface
will be energised.

5.4.1

To commission the central heating

1

Set  mode  to  winter  mode  via  "Mode"  button  on  the  user
interface. (  and   icons are displayed on the screen.)

2

Set  central  heating  set  temperature  to  maximum  value  via  left
dial.  If  connected,  make  sure  all  external  controls  such  as
outdoor sensor and room thermostat are calling for heat.

3

The  boiler  control  now  go  through  its  ignition  sequence.  The
status  indicator  will  glow  constantly  in  blue  if  flame  is
established.   icon will blink when central heating is active.

INFORMATION

After  first  power  ON,  the  boiler  does  not  increase  its
capacity above a preset value for about 12 minutes, even if
there is demand.

▪ First  0~2  minutes:  The  electronic  gas  adaptive  system

calibrates itself.

▪ Next  8~10  minutes:  The  boiler  performs  the  low  water

temperature  function.  You  can  skip  this  function  by
pressing the "Cancel" button for 5 seconds.

4

Press  "Cancel"  and  "Menu"  buttons  together  5  seconds  to
activate the sweeper mode. With sweeper mode, boiler can be
operated  at  maximum  and  minimum  capacity  independent  of
heat demand.

5

"tst - 100" caption will appear on the screen. This means boiler
is  operating  at  nominal  capacity.  Check  nominal  capacity
operation.

6

To  quit  sweeper  mode,  again  press  "Cancel"  and  "Menu"
buttons  together  five  seconds.  Sweeper  mode  will  be
deactivated  and  boiler  will  return  to  normal  operation  mode.
Sweeper mode also finishes automatically after 15 minutes.

5.4.2

To commission the central heating
capacity setting

The  boiler's  central  heating  capacity  can  be  adjusted  form  the
control panel. If the heat loss of installation is much less than that of
the  boiler  nominal  capacity,  it  is  recommended  to  reduce  the  boiler
nominal  capacity  to  the  installation  capacity.  Refer  to  service
instructions for this operation.

5.4.3

To commission the domestic hot water

(Only for model R2CND024A4AA)

1

Set  domestic  hot  water  set  temperature  to  its  maximum  value
via right dial.

2

Open  hot  water  taps  fully  and  ensure  that  water  flows  freely
from them.

3

 icon will blink when domestic water heating is active.

4

Measure the domestic hot water inlet temperature. (Cold water
drawn off from taps)

5

Check that domestic hot water temperature rise is around 34°C.

6

Hand-over to the user

After  completing  the  installation  and  commissioning  of  the  system
the installer should hand over to the householder.

▪ Hand  the  operation  manual  to  the  householder  and  inform  them

about  his/her  responsibilities  under  the  relevant  national
regulations.

▪ Explain  and  demonstrate  the  lighting  and  shutting  down

procedures.

▪ Explain  the  function  and  the  use  of  the  boiler  heating  and

domestic hot water controls.

▪ Explain  and  demonstrate  the  function  of  temperature  controls,

radiator valves etc., for the economic use of the system.

▪ Explain the function of the boiler error mode. Emphasise that if an

error is indicated refer to "Error codes" in the operation manual.

▪ Inform the user about frost protection function and advise never to

cut off the electric supply to the boiler.

▪ Emphasise  that  a  comprehensive  service  should  be  carried  out

annually, especially before winter.

▪ Inform  the  householder  of  the  guarantee  and  the  requirement  to

register it to receive the full benefit of the warranty.

Содержание R2TND012A4AA

Страница 1: ...Installation manual Wall mounted condensing boiler English Installation manual Wall mounted condensing boiler R2CND024A4AA R2TND012A4AA R2TND018A4AA R2TND024A4AA...

Страница 2: ...is t e standardi te ga v i teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nurodytus standartus ir arba kitus norminius dokumentus su s lyga kad yra n...

Страница 3: ...propriately disposed of in accordance with local and national regulations The components are easy to separate and the plastics are marked This allows the various components to be sorted for appropriat...

Страница 4: ...ommissioning repair configuration and service must be performed by qualified competent persons in accordance with local standards and regulations Incorrect installation of this unit may harm the user...

Страница 5: ...es It is controlled by the flow temperature sensor which is located at the outlet of the main heat exchanger This protection activates the boiler pump when the water temperature drops below 13 C and i...

Страница 6: ...rode p High limit thermostat q Fan r Return temperature sensor s Silencer t Automatic air vent pump u Water pressure sensor v By pass w Boiler pump x Domestic hot water flow sensor y Domestic hot wate...

Страница 7: ...max m h 0 12 0 46 0 12 0 69 0 12 0 96 0 12 0 96 Combustion products mass flow rate min max G20 g s 1 32 5 12 1 32 7 78 1 32 10 75 1 32 10 75 Combustion products mass flow rate min max G31 g s 1 23 4 7...

Страница 8: ...ters 50 C return temperature at heater inlet 4 Installation 4 1 To open the unit WARNING Only qualified competent persons are allowed to open the unit Certain actions explained in this document such a...

Страница 9: ...the current I E E Wiring Regulations local Building Regulations or any other local regulations currently in service The intake air must not include chemicals that may cause corrosion toxic gas format...

Страница 10: ...ght and related system charge pressure are given below h p 6 m 0 8 bar 7 m 0 9 bar 8 m 1 0 bar 9 m 1 1 bar 10 m 1 2 bar 11 m 1 3 bar 12 m 1 4 bar 13 m 1 5 bar h h System water height m p System charge...

Страница 11: ...done to avoid discomfort of the user 4 7 Residual pump lift graph The residual pump lift graph shows the amount of pump lift mbar that remains for the central heating circuit 0 0 100 200 300 400 500 6...

Страница 12: ...ge while the gas line to the boiler is open see 5 3 To check for gas leakage on page 24 In case gas piping is adjacent to the wall and is to be connected to the gas pipe connection of the boiler with...

Страница 13: ...ny damage that may occur this way WARNING Use a dedicated power circuit Never use a power supply cable shared by another unit The unit runs on 230 V AC 50 Hz power A power cable is delivered with the...

Страница 14: ...nds that are sent with the unit must be assembled to the bottom sheet of the boiler in case connection of these options Below you can see the cable glands placement PG 9 PG 9 PG 7 PG 7 Holes on the bo...

Страница 15: ...012 024A4AA Wall mounted condensing boiler 3P469346 4E 2017 07 4 8 6 Wiring diagram DANGER RISK OF ELECTROCUTION Disconnect the power supply for more than 10 minutes before servicing Model R2CND024A4A...

Страница 16: ...ace Ext3 X1M Opentherm room thermostat Ext4 X2M External power output 230 V AC Ext5 X2M Reserved not in use X1M X4 X11 X12 Low voltage terminal strip X2M X1 X2 High voltage terminal strip 4 8 7 Guidel...

Страница 17: ...that products of combustion discharging from the terminal cannot re enter the building or other buildings through ventilators windows doors other sources of natural air infiltration or forced ventila...

Страница 18: ...it Optional c 45 elbow 60 100 d Extension 60 100 mm e Flat roof outlet kit f 90 elbow 60 100 g 45 elbow 60 100 h 30 elbow 60 100 i Extension 60 100 L 500 1000 mm Allowable flue length for C33x R2TND R...

Страница 19: ...nd lengths of the flue system For R2TND Nominal combustion products temperature 77 C Combustion products mass flow rate 10 75 g s Overheat combustion products temperature 90 C Minimum combustion produ...

Страница 20: ...use flue outlet duct length must be shortened with the same length Type C83x twin pipes flue system The boiler draws combustion air from outside via a separate supply pipe routed through the external...

Страница 21: ...h 140 19 6 69 2 DN 80 Flex square and rough 130 17 0 60 0 DN 80 Flex square and rough 120 12 2 43 0 DN 80 Star square and rough 140 47 5 167 8 DN 80 Star square and rough 120 33 3 117 9 Allowable flue...

Страница 22: ...e 60 100 with measurement point EKFGP4667 90 elbow 60 100 with measurement point DRMEEA60100BA 90 elbow 60 100 EKFGP4660 90 elbow 80 125 EKFGP4810 45 elbow 60 100 EKFGP4661 45 elbow 80 125 EKFGP4811 3...

Страница 23: ...om the installation with the manual air vent screws on the radiators Make sure screws are tightened after venting 10 If after the venting the pressure decreases below 0 8 bar refill with water until t...

Страница 24: ...Back button INFORMATION Only qualified persons have access to servicing parameters The passwords needed to access service parameters are written in servicing instructions 5 Commissioning WARNING Only...

Страница 25: ...buttons together five seconds Sweeper mode will be deactivated and boiler will return to normal operation mode Sweeper mode also finishes automatically after 15 minutes 5 4 2 To commission the centra...

Страница 26: ......

Страница 27: ......

Страница 28: ...usland Our partners abroad Unsere Partner im Ausland Nos partenaires l tranger Le nostre sedi all estero Neustros representantes en el extranjero Nasi partnerzy za granic Na i partne i v zahrani http...

Отзывы: