Chapter 2: Installation
General Installation Procedure
2-5
Step 3.
Rack/Cabinet installation:
If the subsystem is going to be installed
in a rack or cabinet, it should be installed prior to installing the hard
drives. Installing the subsystem into a rack or cabinet requires at
least two (2) people.
Step 4.
Install hard drives:
Hard drives have been preinstalled and tested in
drive trays. Use this procedure for replacement of faulty drives (See
Section 2.9
)
Step 5.
Install drive trays:
After the hard drives have been installed into the
drive trays, the drive trays must be installed into the enclosure itself.
(See
Section 2.10
)
Step 6.
Cable connection:
Use the power cords that came with the
subsystem to connect the subsystem to the main power source. Use
self-purchased SCSI cables (see
Chapter 4
for more details) to
connect host ports to servers.
Step 7.
Power up:
Once the components have been properly installed and
all cables are properly connected, you can power up the subsystem
and configure the RAID array. (See
Section 4.4
)
2.4.1
Installation Procedure Flowchart
Figure 2-1
shows a flowchart of the installation procedure. As you complete each
step, check off the “
Done
” box on the right. Please use this flowchart in conjunction
with the instructions that follow.
Содержание Galaxy Raid GALHDX-7370S-8U4D
Страница 28: ...Galaxy RAID GALHDX 7370S 8 12U4D Installation and Hardware Reference Manual Hot Swappable Components 1 16...
Страница 43: ...Chapter 2 Installation 2 15...
Страница 65: ...Galaxy RAID GALHDX 7370S 8 12U4D Installation and Hardware Reference Manual Power Off Procedure 4 12...
Страница 91: ...Galaxy RAID GALHDX 7370S 8 12U4D Installation and Hardware Reference Manual Spare Parts and Accessories B 4...
Страница 96: ...Appendix C Pinouts Main Power C 5 Main Power...