Galaxy A16F-R2422 Installation and Hardware Reference Manual
Subsystem Connection and Operation
4-16
This screen appears after the initialization
process. It clearly shows the model name.
Verifying installed cache memory.
System is ready. You can now start to
configure the subsystem.
4.6 Power Off Procedure
If you wish to power down the A16F-R2422, please follow these steps:
NOTE:
If you wish to power down the A16F-R2422, please ensure that no time-
consuming processes, like a “logical drive parity” check or a
“background scrub,” are running.
Step 1.
Stop I/O access to the system.
Stop all I/O access to the Galaxy subsystem. Please refer to the
related documentation of your applications.
Step 2.
Flush the cache.
Locate the C_Dirty LED on the back of controller module to check
if there is still cached data in memory. Use the Shutdown Controller
function to flush all cached data. This prepares the RAID subsystem
to be safely powered down.
Step 3.
Turn off the power.
Turn off the power switches at the top of the rear panel of the A16F-
R2422. Once the subsystem has been powered down, other devices
that are connected to the subsystem may be powered down.
A16F-R2422
256MB RAM, Wait…
A16F-R2422 P/S
No Host LUN
A16F-R2422
Modem Not Config