Calibration
Power Supply NGMO
7.3 Calibration Procedure
In the following you are taken through the complete calibration proce-
dure for one of the power supply channels.
NOTE:
The NGMO must be switched on one hour before the
calibration process in order to reach the correct operating
temperature.
NOTE:
The following process describes the calibration for channel A.
1. Prepare the test set-up as shown in Fig. 7-2.
2. Switch on NGMO acc. to section 5.3, DVM and Calibration
adapter.
3. Press key CHN to switch to channel A.
The display must show the following:
AS: x.xxxV y.yyyA
A:OFF
4. Press key MENU.
5. Turn rotary knob VARIATION to select menu option A38.
6. Press ENTER.
The display must show the following:
Press ENTER for next step
7. Press ENTER.
3.00 / 05-2014
7-3
Содержание NGMO1
Страница 1: ...Service Manual Power Supply NGMO1 and Power Supply NGMO2 192 1500 21 and 192 1500 24 5707 2571 82 ...
Страница 12: ...Power Supply NGMO User Information 1 4 3 00 05 2014 ...
Страница 14: ...Power Supply NGMO Customer Service 2 2 3 00 05 2014 ...
Страница 16: ...Power Supply NGMO Safety 3 2 3 00 05 2014 ...
Страница 21: ...Unit Description Power Supply NGMO Fig 4 2 Power Supply NGMO Function block diagram 3 00 05 2014 4 5 ...
Страница 22: ...Power Supply NGMO Unit Description 4 6 3 00 05 2014 ...
Страница 42: ...Power Supply NGMO Calibration 7 12 3 00 05 2014 ...
Страница 72: ...Power Supply NGMO Interfaces 10 4 3 00 05 2014 ...
Страница 74: ...Power Supply NGMO Bill of Materials 11 2 3 00 05 2014 ...