Rockwell Automation Publication 6300M-UM001A-EN-P - December 2021
13
Chapter
2
Install the Monitor
Follow these guidelines and procedures to help you plan your installation,
prepare the panel cutout, and mount and power up the monitor.
Unpack the Monitor
Before you unpack the monitor, inspect the shipping carton for damage. If
damage is visible, immediately contact the shipper and request assistance.
Otherwise, proceed with unpacking.
Keep the original packing material in case you must return the monitor for
repair or transport it to another location.
The monitors ship with the following items.
Table 1 - Parts List
Item
Description
Hardware
• Mounting clips (for panel mounting)
• DC power connector assembly kit (DC-powered models)
Document
• For non-hazardous applications:
VersaView® 6300M Industrial Panel Monitors Installation Instructions, publication
• For hazardous locations:
VersaView 6300M Panel Monitors for Hazardous Locations Installation Instructions, publication