Rockwell Automation Publication LDAT-UM001A-EN-P - April 2016
57
Maintenance
Chapter 5
Be sure the cables are not touching the slide assembly.
3.
Loosely attach the coil to the stator body.
4.
Align the first bearing puck to the first set of bearing mounting holes on
the connector side of the stator body.
5.
Loosely install the bearing puck screws.
6.
Slide another bearing puck on to the bearing rail.
7.
Align with set mounting holes next to the previous bearing puck.
8.
Loosely attach the bearing puck.
9.
Repeat
until all the bearing pucks are installed.
10.
Torque the bearing puck screws to values shown.
11.
Torque the bearing rail screws to value shown in previous step.
12.
Attach the connectors to the stator body.
13.
Attach the end stop bracket to the slider assembly.
14.
Check the cable clearance in stator body.
Slide the slider assembly and verify the cables do not come in contact
with it.
15.
Attach the stator end cap.
16.
If your linear thruster has the strip cover option, install the cover by
following the Remove Strip Cover procedure on page
in reverse.
ATTENTION:
Be sure the cables do not come in contact with the
slider assembly when completing the assembly. Contact with moving
parts can cause damage to the cables and premature failure of the
linear thruster.
Mounting Screw Size
Torque
N•m (lb•in)
M3
1.1 (10)
M4
2.8 (25)
M5
4.5 (40)
M6
9.5 (84)
M8
24 (212)
Содержание Allen-Bradley LDAT-S03 Series
Страница 6: ...6 Rockwell Automation Publication LDAT UM001A EN P April 2016 Table of Contents Notes...
Страница 50: ...50 Rockwell Automation Publication LDAT UM001A EN P April 2016 Chapter 4 Commission Notes...
Страница 75: ...Rockwell Automation Publication LDAT UM001A EN P April 2016 75 Index Notes...