Copyright PSC
2000781K MkII MLB Operating Procedure
Page 51 of 68
Step
Procedure
Date & Initials
Tech.
QA
10.3.2
Perform the following to operate the test circuit.
1. Designate a person to watch the power source output display.
2. Turn on the power source output.
3. Verify the oscilloscope trigger is active and ready to acquire data.
4. Activate the timer relay.
5. Verify the following occurred:
5.1. All four measurement channels (voltage and current) remained at zero.
The oscilloscope should not trigger.
5.2.
The power source’s current indicator remained at zero. This ensures
even a small voltage or current, below the oscilloscope’s trigger level,
did not pass through.
6. If positions or scales were altered to examine data, ensure they are
returned to their original values.
7. Turn off the power source output.
If any parameters are not met, make the required changes and repeat this step.
Any change to the
Deploy Power and Measurement Circuit
shall also require
re-running
Deploy Test Circuit #1
per section 10.1 and
Deploy Test Circuit #2
per section 10.2.
Remove the
Test Circuit: Deployed
portion of
Deploy
Test Circuit #3
in Figure
-----N/A-----
Содержание PSC MOTORIZED Lightband MKII
Страница 25: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 25 of 68 Figure 8 1 Stow test circuit 1...
Страница 37: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 37 of 68 Figure 9 1 SFF test circuit 1...
Страница 46: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 46 of 68 Figure 10 1 Deploy test circuit 1...