2000781K MkII MLB Operating Procedure
Page 48 of 68
10.2 Deploy Test Circuit #2 (Intermediate State)
Step
Procedure
Date & Initials
Tech.
QA
Set up the
Test Circuit: Intermediate
portion of
Deploy Test Circuit #2
per
Figure 10-2 and connect to the
Deploy Power and Measurement Circuit
.
Figure 10-2: Deploy test circuit #2