Copyright PSC
2000781K MkII MLB Operating Procedure
Page 27 of 68
8.2 Stow Test Circuit #2 (Intermediate State)
Step
Procedure
Date & Initials
Tech.
QA
8.2.1
Set up the
Test Circuit: Intermediate
portion of
Stow Test Circuit #2
per Figure
8-2 and connect to the
Stow Power and Measurement Circuit
.
Figure 8-2: Stow test circuit #2
Содержание PSC MOTORIZED Lightband MKII
Страница 25: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 25 of 68 Figure 8 1 Stow test circuit 1...
Страница 37: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 37 of 68 Figure 9 1 SFF test circuit 1...
Страница 46: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 46 of 68 Figure 10 1 Deploy test circuit 1...