2000781K MkII MLB Operating Procedure
Page 57 of 68
11.
Removing the Lightband from Adjoining Structures
11.1.1 Step
Procedure
Date & Initials
Tech.
QA
11.1.1
Removing the Lower Ring of an
MLB 15.000-24 only
.
All other sizes shall skip
this step. Also skip this step if using reduced head fasteners per section 14.
Remove the Lower Ring by reversing step 6.1.9. If adjoining structure holes are
threaded, back out the fasteners slowly to prevent jamming the heads against
the Leaf Pins. Once all fasteners are loose, hold the washer against the Lower
Ring and pull the screw out. Push the Leaf Pins to either side if they rub the
screw head. Then remove the washers. See Figure 11-1 & Figure 11-2. Upon
completion skip to step 11.1.3.
11.1.2
Removing the Lower Ring on all Lightbands
other than an MLB 15.000-24 or
if using reduced head fasteners per section 6
Remove the Lower Ring by reversing step 6.1.8.
It is often helpful to hold the washer against the Lower Ring while pulling the
screw out separately. See Figure 11-1 & Figure 11-2.
11.1.3
Remove the Upper Ring from the adjoining structure by reversing step 6.1.11.
Figure 11-1: Removing a SHC screw from the Lower Ring, outer view
Figure 11-2: Removing a SHC screw from the Lower Ring, inner view
Содержание PSC MOTORIZED Lightband MKII
Страница 25: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 25 of 68 Figure 8 1 Stow test circuit 1...
Страница 37: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 37 of 68 Figure 9 1 SFF test circuit 1...
Страница 46: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 46 of 68 Figure 10 1 Deploy test circuit 1...