![ROCKET LAB PSC MOTORIZED Lightband MKII Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/rocket-lab/psc-motorized-lightband-mkii/psc-motorized-lightband-mkii_operating-procedure_1472596053.webp)
Copyright PSC
2000781K MkII MLB Operating Procedure
Page 53 of 68
Step
Procedure
Date & Initials
Tech.
QA
Verify the DB-9 pin connector of the
Deploy Power and Measurement Circuit
in
is visibly clean. Any debris could detrimentally contaminate the
Lightband’s mating socket connector.
Connect the Lightband to the
Deploy Power and Measurement Circuit
per
Figure 10-4. Do not apply power to the Lightband.
Figure 10-4: Deploy circuit
Содержание PSC MOTORIZED Lightband MKII
Страница 25: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 25 of 68 Figure 8 1 Stow test circuit 1...
Страница 37: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 37 of 68 Figure 9 1 SFF test circuit 1...
Страница 46: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 46 of 68 Figure 10 1 Deploy test circuit 1...