![ROCKET LAB PSC MOTORIZED Lightband MKII Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/rocket-lab/psc-motorized-lightband-mkii/psc-motorized-lightband-mkii_operating-procedure_1472596035.webp)
Copyright PSC
2000781K MkII MLB Operating Procedure
Page 35 of 68
Step
Procedure
Date & Initials
Tech.
QA
8.4.11
Disconnect the
Stow Power and Measurement Circuit
in Figure 8-4
from the
Lightband’s DB-9 connector.
8.4.12
Measure resistance directly at the Lightband's DB-9 socket connector and
complete Table 8-2. Contact PSC if a discrepancy is found.
PSC recommends using a DMM. It will not cause damage to or operate the
Lightband. If using a milliohm meter (four wire Kelvin probe system) ensure the
test current is <0.01 A to prevent rotating the motors.
See Figure 13-1 for the Stowed Motor Bracket Assembly switch state.
Note: ensure the mating DB-9 pin connector is visibly clean to prevent
contaminating the Light
band’s socket connector.
Table 8-2: Stowed resistance measurements (values apply only at NTP)
Lightband State
Object Being Measured
Pin
Connections
Resistance [
Ω]
Allowable (1)
Measured
Stowed
Motor A
2 , 4
8.0 to 11.0
Motor B
6 , 8
8.0 to 11.0
Deploy Limit Switch A
1 , 2
< 0.3
Deploy Limit Switch B
5 , 6
< 0.3
Stow Limit Switch A
3 , 4
> 1E7
Stow Limit Switch B
7 , 8
> 1E7
Stow Limit Switch A
4 , 9
< 0.3
Stow Limit Switch B
8 , 9
< 0.3
(1) Ensure the over limit (OL) indication on the resistance measurement device complies with the
maximum tolerance. This is the case for the DMM referenced in Table 2-5.
Step
Procedure
Date & Initials
Tech.
QA
8.4.13
If weights or a fixture were used to compress the Lightband, they may be
removed at this time. If LCTs were used, remove cable ties per section 17.5.
Содержание PSC MOTORIZED Lightband MKII
Страница 25: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 25 of 68 Figure 8 1 Stow test circuit 1...
Страница 37: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 37 of 68 Figure 9 1 SFF test circuit 1...
Страница 46: ...Copyright PSC 2000781K MkII MLB Operating Procedure Page 46 of 68 Figure 10 1 Deploy test circuit 1...