3
1. Record the reading on existing dial.
2. Remove the 2 side screws on the left and right
side of the 4” dial. You can now remove the
old dial from its retainer.
3. With the old (4”) dial removed, keep the
two mounting brackets on the Left and
Right side attached to gauge head shown
below on existing 4” dial gauge.
Installation Instructions for e-Dial™
2
2
Note: For 8” dials remove all three existing
brackets attached to the head and install two
4” dial brackets (0093s00001; sold separately)
with 2 screws (0040-00413) each bracket. You
may use 4 of the 6 screws from removal of
existing dial brackets for 8” dial.
3
3
4. Provided with the e-Dial™ are two metal
standoffs. Screw the standoffs on the
existing mounting bracket holes where the
4” dial was mounted on.
5. Once the new standoffs are installed the
e-Dial™ may be fitted in place over the
standoffs. Torque the e-Dial™ screws to
22 lbf·ft (29.8 N·m) shown to complete
installation.
6. Once the e-Dial™ is powered on after
properly connecting to safety barrier
(Refer to safety barrier installation guide)
and power source, compare the new
Digital Gauge Indicator reading to recorded
readings or estimated tank contents. If the
new DGI is not correct (+5%), the DGI may
need adjustment.
5
5
The Measure of Excellence
e-Dial™ P/N: 6317-00001
Note: For 8” Dials, remove the three
screws on the three brackets attached to
the existing dial, then remove old dial.
Содержание 6317-00001
Страница 1: ...User Manual...
Страница 2: ...The Measure of Excellence e Dial P N 6317 00001 ii...