29
4 INSTALLATION
4.1 On-site positioning of blower
The blower has to be set horizontally on a level surface and attached using screws which secure the feet or
the outlet flange ( /F e /SP version).
4.2 Changing the inlet/outlet arrangement
To move from the arrangement with inlet and outlet on a vertical axis to that with inlet and outlet on an
horizontal axis and viceversa exchange the oil levels by changing the position of the plugs in accordance with
Fig. 4 on both blower sumps and rotate the cooling chamber 20A in order to maintaine the oiler in upper side.
Pos Description
Ps
Left foot
Pd
Right foot
Tc
Oil fill plug
Ts
Oil drain plug
T
Plugs
L
Oil level plugs
Fig. 4
4.3 Direction of rotation – Gas flow direction
Standard flow
Inverted flow F.I.
Fig. 5
Warning : Do not use the blower with a direction of rotation or a flow direction different from
that one shown in Fig 5.
Tc
Ts
Pd
L
T
Ts
L
Ps
L
Pd
Ts
Ps
T
L
Ts
Tc
Содержание RBS 105 AV
Страница 43: ...43 9 2 Ingombro 9 2 Overall dimension...