- 33 -
H
L
Rotoplat DW 108 - 508
Rotoplat DW-C 108 - 508
14C214021
M H
L
N
Rotoplat DW 108 - 508
Rotoplat DW-C 108 - 508
14C214022
Rotoplat DW-C 108 - 508
14C214023
English
- 33 -
Chapter 4
INFORMATION ON HANDLING AND INSTALLATION OPERATIONS
Slide guide mast assembly
1. Lift and position the slide guide
mast
(H)
over the rotating table
in correspondence with the hinge.
2. Insert the screws
(L)
in the hinge
without tightening them
(Only forsliding shaft with height
2800-3100 mm).
3. Secure the hook of the lifting
equipment to the bracket
(M)
of
the sliding mast and tension it
(Only forsliding shaft with height
2200-2400 mm).
4. Lift the sliding mast
(H)
.
5. Secure the sliding mast to the
machine body with the screws
(N)
.
6. Tighten the hinge screws
(L)
.
Carrier assembly
1. Mount the side supports
(A)
and
secure them with the screws
(B)
.
2. Assemble the roller conveyor
(C)
and secure it with the screws
(D)
.
3. Assemble rollers
(E)
.
Содержание Rotoplat DW 108-508
Страница 2: ......
Страница 4: ......
Страница 51: ... 47 3 3 1 2 1 5 4 6 7 10 9 8 English 47 Chapter 6 ABOUT THE USE ...
Страница 52: ... 48 3 2 1 1 5 6 7 10 9 8 3 3 1 English Chapter 6 ABOUT THE USE ...
Страница 88: ... 84 English Chapter 10 ENCLOSED DOCUMENTATION Page deliberately empty ...