- 32 -
A
B
B
C
D
E
G
F
Rotoplat DW 108 - 508
Rotoplat DW-C 108 - 508
14C214020
English
Chapter 4
INFORMATION ON HANDLING AND INSTALLATION OPERATIONS
4.3.
TRANSPORT AND HANDLING
Transport, also according to the
destination, can be performed by
different vehicles.
The diagram represents the most
popular solutions.
In the transportation phase, adequately
anchor the machine to the means of
transport to avoid sudden shifting
Important
For further transportation, recreate
the initial packaging conditions for
transport and handling.
4.4.
INSTALLATION OF DISMOUNTED PARTS
Following are the steps to be taken to install dismantled parts
Electrical box assembly
Proceed as indicated
1. Cut the band
(A)
that holds the
electrical wires together.
2. Remove the blocking rods
(B)
.
3. Insert the electrical wires
(C)
in
the slide shaft.
4. Lift the electrical box
(D)
.
5. Fasten the electrical box to the
slide mast using the screws
(E)
.
6. Close the cover
(F)
of the
electrical box
(D)
with the key
(G)
.
Transport vehicles
Lifting equipment
Содержание Rotoplat DW 108-508
Страница 2: ......
Страница 4: ......
Страница 51: ... 47 3 3 1 2 1 5 4 6 7 10 9 8 English 47 Chapter 6 ABOUT THE USE ...
Страница 52: ... 48 3 2 1 1 5 6 7 10 9 8 3 3 1 English Chapter 6 ABOUT THE USE ...
Страница 88: ... 84 English Chapter 10 ENCLOSED DOCUMENTATION Page deliberately empty ...