10ft Wide Polytunnel Assembly Instructions
Copyright © Robinson Polytunnels 2009 - 2018
9
6.
TIMBER BASE RAIL (OPTION)
1
Set the M20 fittings on the corner Foundation Tubes so that the holes in the
plate are about 5cm above ground level.
2
Start at one end of the polytunnel, at the door post. Place the end of the
timber 75mm x 38mm x 240cm long up to the side of the door post. Mark the
timber to the outside face of the M20 fitting and cut to length.
3
Re-position the piece of timber and mark through the
hole on the M20 fitting and drill the timber to accept an
8mm diameter bolt.
Tip! Use the timber offcuts wherever they are long
enough.
4
Bolt the timber to the M20 fitting with an
M8 x 50 coach bolt and nut.
5
Using a flat nail plate, fix the timber to the
door post with 30mm long twist nails. Nail
through the door post into the end of the
timber with a 125mm long nail.
6
Lay the next timber along the side of the
polytunnel, flush with the outside of the timber
base rail on the end of the polytunnel. Mark
through the hole in the M20 fitting and drill to
accept an M8 bolt.
7
Bolt the timber to the M20 fitting with an M8 x
50 coach bolt and nut.
8
On the next Foundation Tube, position an SC20 fitting over the
Foundation Tube and mark through the two holes. Drill to accept
an M8 bolt and fix in place with two M8 x 65 coach bolts and nuts.
9
Continue until you reach the end of the polytunnel and trim the last
timber to length.
Содержание 10ft Wide Polytunnel
Страница 1: ......
Страница 25: ...10ft Wide Polytunnel Assembly Instructions Copyright Robinson Polytunnels 2009 2018 25 PARTS LIST...
Страница 26: ...10ft Wide Polytunnel Assembly Instructions Copyright Robinson Polytunnels 2009 2018 26 PARTS LIST continued...
Страница 27: ...10ft Wide Polytunnel Assembly Instructions Copyright Robinson Polytunnels 2009 2018 27 PARTS LIST continued...