10ft Wide Polytunnel Assembly Instructions
Copyright © Robinson Polytunnels 2009 - 2018
13
8.
ROLL UP CURTAIN (OPTION)
1
Cut the 2m wide roll of polythene down the centre (to 1m wide).
2
Join the lengths of curtain tube together starting with
the plain-ended piece. Fix the tubes together with a
self-drill screw. Cut the last piece to length so that the
overall length of the tube is 30cm shorter than the gap
between the vertical corner timbers.
Tip! The curtain operates better if the gearbox is
positioned at the “low” end of the ‘tunnel.
3
Slot the drive tube end into the curtain tube at
the end where you want to operate the
gearbox. Fix together with a self-drill screw,
65-70mm from the swage shoulder (to avoid
drilling into the square shaft).
4
Slot a black PVC plug into the other end of the drive tube.
5
Roll out the 1m wide polythene along the side of the polytunnel and lay
the drive tube on top, close to one edge.
6
With the PVC clips, clip the polythene to the drive tube at approximately
every 30cm, keeping the polythene as straight as possible.
7
Rest the drive tube on top of the base rail with
approximately 2cm gap between the end of the
drive tube and the vertical corner timber. Staple
the top edge of the polythene to the side rail,
flush with the top edge. At each end of the drive
tube, trim of the surplus polythene.
Содержание 10ft Wide Polytunnel
Страница 1: ......
Страница 25: ...10ft Wide Polytunnel Assembly Instructions Copyright Robinson Polytunnels 2009 2018 25 PARTS LIST...
Страница 26: ...10ft Wide Polytunnel Assembly Instructions Copyright Robinson Polytunnels 2009 2018 26 PARTS LIST continued...
Страница 27: ...10ft Wide Polytunnel Assembly Instructions Copyright Robinson Polytunnels 2009 2018 27 PARTS LIST continued...